All Iowa counties

Iowa · federal rates

Appanoose County, Iowa: Davis-Bacon wage rates (2026)

5 federal wage determinations cover Appanoose County. Rates below were taken from SAM.gov on 2026-09-20.

Heavy

IA20260002, modification 2 (published 2026-06-24)

Common trades from this wage determination. It lists 37 classifications in total; the full text is on SAM.gov.

TradeClassificationBaseFringeListed totalWhere the rate comes from
CarpenterCARPENTER$34.25$29.53$63.78Union agreement CARP0004-007, 2025-05-01 · Price a crew using this row
CARPENTER (MISSISSIPPI RIVER (IOWA SIDE))$28.55$16.29$44.84DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
CARPENTER (MISSISSIPPI RIVER (WORK THAT PERTAINS TO BOTH BANKS, OR EXTENDS ACROSS THE MISSISSIPPI RIVER. IF A HIGHER RATE OF PAY PREVIALIS IN THE ADJOINING STATES, THEN THOSE RATES SHALL APPLY))$34.60$21.38$55.98DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
CARPENTER (MISSOURI RIVER)$31.25$12.43$43.68DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
LaborerLABORERS: GROUP 1 (SCOTT COUNTY) FLAGMAN; DUMPMAN; SPOTTER; BROOM MAN; LANDSCAPER; PLANTING & REMOVAL OF TREES; FENCING LABORERS; CLEANING OF FORMS OR LUMBER (IN BONE YARD); LAYING OF SOD; MOVING AND/OR MAINTENANCE OF FLARES & BARRICADES; OPERATION OF ALL HAND, ELECTRIC, AIR, HYDRAULIC OR MECHANICALLY POWERED TOOLS UND … (the classification continues in the wage determination)$33.77$23.60$57.37Union agreement LABO0309-005, 2024-01-01 · Price a crew using this row
LABORERS: GROUP 2 (SCOTT COUNTY) ASPHALT RAKER OR LUTEMAN; PIPE SETTER ON SEWER OR WATER MAIN; GUNNITE NOZZLE MAN; ASPHALT OR CONCRETE CURB MACHINE OPERATOR; CONCRETE BURNING MACHINE OPERATOR; & CORING MACHINE OPERATOR; HAZARDOUS WASTE WORKER; ASBESTOS ABATEMENT WORKER$34.27$23.60$57.87Union agreement LABO0309-005, 2024-01-01 · Price a crew using this row
LABORERS: GROUP 3 (SCOTT COUNTY) CONCRETE SPECIALIST (ALL WORK RELATING TO BUT NOT LIMITED TO POURING, STRIKING OF & FINISHING ALL CONCRETE SURFACES)$34.90$23.60$58.50Union agreement LABO0309-005, 2024-01-01 · Price a crew using this row
LABORERS: CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel highway formsetter … (the classification continues in the wage determination)$30.92$8.60$39.52DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
LABORERS: CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel highway formsetter … (the classification continues in the wage determination)$28.92$8.60$37.52DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
LABORERS: CLASS AA- Pipelayer, concrete specialist; tunnelman (MISSOURI RIVER)$29.95$8.60$38.55DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
LABORERS: CLASS AA- Pipelayer, concrete specialist; tunnelman (MISSISSIPPI RIVER)$31.95$8.60$40.55DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
LABORERS: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and painter (striper … (the classification continues in the wage determination)$29.22$8.60$37.82DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
LABORERS: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and painter (striper … (the classification continues in the wage determination)$28.22$8.60$36.82DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
LABORERS: CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (MISSISSIPPI RIVER)$26.05$8.60$34.65DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
LABORERS: CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (MISSOURI RIVER).$ 24.05 8.60 TRUCK DRIVER (MISSISSIPPI RIVER)$24.88$10.50$35.38DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
IronworkerIRONWORKER (EXCLUDING DES MOINES, LEE, DUBUQUE, CLAYTON, ALLAMAKEE, HARRISON, POTTAWATTAMIE, MILLS, FREMONT, JACKSON, CLINTON, LOUISA, MUSCATINE, WOODBURY AND MONONA COUNTIES)$37.50$30.99$68.49Union agreement IRON0111-005, 2024-07-01 · Price a crew using this row
IRONWORKERS: SETTING OF ALL STRUCTURAL STEEL AND REINFORCING STEEL INSTALLATION (DES MOINES AND LEE COUNTIES)$29.42$16.68$46.10DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
IRONWORKERS: SETTING OF ALL STRUCTURAL STEEL AND REINFORCING STEEL INSTALLATION (DUBUQUE, CLAYTON & ALLAMAKEE COUNTIES)$26.67$16.68$43.35DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
IRONWORKERS: SETTING OF ALL STRUCTURAL STEEL AND REINFORCING STEEL INSTALLATION (HARRISON, POTTAWATTAMIE, MILLS & FREMONT COUNTIES)$24.89$16.68$41.57DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
IRONWORKERS: SETTING OF ALL STRUCTURAL STEEL AND REINFORCING STEEL INSTALLATION (JACKSON, CLINTON, LOUISA & MUSCATINE COUNTIES)$36.20$16.68$52.88DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
IRONWORKERS: SETTING OF ALL STRUCTURAL STEEL AND REINFORCING STEEL INSTALLATION (WOODBURY & MONONA COUNTIES)$19.46$16.68$36.14DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
Power equipment operatorPOWER EQUIPMENT OPERATORS: GROUP 1 CRANE (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT (CEDAR, CLINTON, DES MOINES, LEE, LOUISA, MUSCATINE AND SCOTT COUNTIE S)$43.50$41.25$84.75Union agreement ENGI0150-008, 2025-06-01 · Price a crew using this row
POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILLER (THROW BUCKET); BLASTHOLER SELF-PROPELLED ROTARY DRILL OR SIMILAR MACHINES; BOOM TRACTOR OR SIDE BOOM; BORING MACHINE (DIRECTIONAL, VERTICAL OR HORIZONTAL); BUILDING H … (the classification continues in the wage determination)$37.80$41.25$79.05Union agreement ENGI0150-008, 2025-06-01 · Price a crew using this row
POWER EQUIPMENT OPERATORS: GROUP A (REMAINING COUNTIES MISSISSIPPI RIVER)$44.07$18.15$62.22Union agreement ENGI0234-002, 2024-12-01 · Price a crew using this row
POWER EQUIPMENT OPERATORS: GROUP A (REMAINING COUNTIES MISSOURI RIVER)$43.59$18.15$61.74Union agreement ENGI0234-002, 2024-12-01 · Price a crew using this row
POWER EQUIPMENT OPERATORS: GROUP B (REMAINING COUNTIES MISSISSIPPI RIVER)$43.38$18.15$61.53Union agreement ENGI0234-002, 2024-12-01 · Price a crew using this row
POWER EQUIPMENT OPERATORS: GROUP B (REMAINING COUNTIES MISSOURI RIVER)$42.92$18.15$61.07Union agreement ENGI0234-002, 2024-12-01 · Price a crew using this row
POWER EQUIPMENT OPERATORS: GROUP C (REMAINING COUNTIES MISSISSIPPI RIVER)$41.05$18.15$59.20Union agreement ENGI0234-002, 2024-12-01 · Price a crew using this row
POWER EQUIPMENT OPERATORS: GROUP C (REMAINING COUNTIES MISSOURI RIVER)$40.66$18.15$58.81Union agreement ENGI0234-002, 2024-12-01 · Price a crew using this row
Cement mason / concrete finisherCEMENT MASON/CONCRETE FINISHER (SCOTT COUNTY)$33.12$28.39$61.51Union agreement PLAS0018-020, 2025-01-01 · Price a crew using this row
CEMENT MASON/CONCRETE FINISHER$33.35$10.05$43.40DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
Truck driverTRUCK DRIVER (MISSOURI RIVER)$24.88$10.50$35.38DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it
TRUCK DRIVERS: GROUP 1 (SCOTT COUNTY) DRIVERS ON 2 AXLE TRUCKS HAULING LESS THAN 9 TONS , AIR COMPRESSOR AND WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS, WAREHOUSEMEN, GREASERS AND TIREMEN, PICK- UP-TRUCKS WHEN HAULING MATERIAL, TOOLS OR MEN TO AND FROM AND ON THE JOB SITE, AND FORKLIFTS UP TO … (the classification continues in the wage determination)$45.35$16.11$61.46Union agreement TEAM0371-001, 2025-07-01 · Price a crew using this row
TRUCK DRIVERS: GROUP 2- 2 OR 3 AXLE TRUCKS HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS. A-FRAME WINCH TRUCKS, OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES. FORKLIFTS OVER 6,000 LB CAPACITY, WINCH TRUCKS, FOUR AXLE COMBINATION UNITS, HYDROLIFT TRUCKS, VACTOR TRUCKS OR SIMIOLAR EQUIPMENT WHEN USE … (the classification continues in the wage determination)$45.93$16.11$62.04Union agreement TEAM0371-001, 2025-07-01 · Price a crew using this row
TRUCK DRIVERS: GROUP 3- 2, 3, AND 4 AXLES HAULING 16 TONS OR MORE, WATER PULLS, 5 AXLES OR MORE COMBINATION UNITS, WATER PULLS, ARTICULATED DUMP TRUCKS FOOTNOTE: PENSION: $52.80 PER DAY IN ADDITIONAL FRINGE BENEFITS$46.25$16.11$62.36Union agreement TEAM0371-001, 2025-07-01 · Price a crew using this row
TRUCK DRIVERS: GROUP 4 (SCOTT COUNTY) OIL DISTRIBUTORS, LOWBOYS FOOTNOTE: A. PENSION: $52.80 PER DAY$46.60$16.11$62.71Union agreement TEAM0371-001, 2025-07-01 · Price a crew using this row
TRUCK DRIVERS: GROUP 5 (SCOTT COUNTY) DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK FOOTNOTE: A. PENSION: $52.80 PER DAY$47.71$16.11$63.82Union agreement TEAM0371-001, 2025-07-01 · Price a crew using this row

Heavy

IA20260003, modification 1 (published 2026-05-18)

Common trades from this wage determination. It lists 119 classifications in total; the full text is on SAM.gov.

TradeClassificationBaseFringeListed totalWhere the rate comes from
CarpenterCARPENTERS (WATERLOO/CEDAR FALLS)$29.53$17.49$47.02DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CARPENTERS (SIOUX CITY)$33.33$13.68$47.01DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CARPENTERS (POLK COUNTY)$37.53$13.54$51.07DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CARPENTERS (MUSCATINE COUNTY, CITY OF MUSCATINE)$27.97$18.50$46.47DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CARPENTERS (LINN COUNTY)$33.58$17.49$51.07DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CARPENTERS (IOWA CITY)$29.53$17.49$47.02DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CARPENTERS (FORT MADISON)$29.53$17.49$47.02DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CARPENTERS (DUBUQUE COUNTY (CITY OF DUBUQUE))$29.53$17.49$47.02DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CARPENTERS (COUNCIL BLUFFS)$33.33$13.68$47.01DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CARPENTERS (CLINTON, DUBUQUE, JOHNSON, LOUISA, MUSCATNE, DES MOINES, CEDAR AND LEE COUNTIES, EXCEPT ANY OF THE PREVIOUSLY NAMED CITIES)$25.45$15.49$40.94DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CARPENTERS (CLINTON COUNTY, CITY OF CLINTON)$29.53$17.49$47.02DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CARPENTERS (BURLINGTON AND KEOKUK)$29.53$17.49$47.02DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CARPENTERS (ALL OF THE STATE OF IOWA, EXCEPT THE NAMED CITIES AND COUNTIES LISTED BELOW:)$27.26$13.68$40.94DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
LaborerLABORERS (WATERLOO/CEDAR FALLS)$26.89$9.38$36.27DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
LABORERS (SIOUX CITY)$26.89$9.38$36.27DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
LABORERS (POLK COUNTY)$30.77$9.38$40.15DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
LABORERS (MUSCATINE COUNTY (CITY OF MUSCATINE))$30.35$9.38$39.73DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
LABORERS (LINN COUNTY)$30.87$9.38$40.25DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
LABORERS (IOWA CITY)$28.35$9.38$37.73DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
LABORERS (FORT MADISON)$30.11$9.38$39.49DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
LABORERS (DUBUQUE COUNTY (CITY OF DUBUQUE))$26.89$9.38$36.27DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
LABORERS (COUNCIL BLUFFS)$26.89$9.38$36.27DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
LABORERS (CLINTON, DUUQUE, JOHNSON, LOUISA, MUSCATINE, DES MOINES, CEDAR AND LEE COUNTIES, EXCEPT ANY OF THE PREVIOUSLY NAMED CITIES)$26.89$9.38$36.27DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
LABORERS (CLINTON COUNTY, CITY OF CLINTON)$29.52$9.38$38.90DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
LABORERS (BURLINGTON AND KEOKUK)$30.11$9.38$39.49DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
LABORERS (ALL OF THE STATE OF IOWA, EXCEPT FOR THE NAMED CITIES AND COUNTIES LISTED BELOW:)$25.14$9.38$34.52DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
IronworkerIRONWORKER (WATERLOO/CEDAR FALLS)$27.53$16.37$43.90DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
IRONWORKER (SIOUX CITY)$18.57$16.37$34.94DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
IRONWORKER (POLK COUNTY)$27.37$16.37$43.74DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
IRONWORKER (MUSCATINE COUNTY)$35.04$16.37$51.41DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
IRONWORKER (LINN COUNTY)$27.53$16.37$43.90DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
IRONWORKER (IOWA CITY)$27.53$16.37$43.90DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
IRONWORKER (FORT MADISON)$28.58$16.37$44.95DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
IRONWORKER (DUBUQUE COUNTY (CITY OF DUBUQUE))$27.53$16.37$43.90DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
IRONWORKER (COUNCIL BLUFFS)$24.15$16.37$40.52DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
IRONWORKER (CLINTON, DUBUQUE, JOHNSON, LOUISA, MUSCATINE, DES MOINES, CEDAR AND LEE COUNTIES, EXCEPT ANY OF THE PREVIOUSLY NAMED CITIES)$23.75$16.37$40.12DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
IRONWORKER (CLINTON COUNTY, CITY OF CLINTON)$35.04$16.37$51.41DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
IRONWORKER (BURLINGTON AND KEOKUK)$28.58$16.37$44.95DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
IRONWORKER (ALL OF THE STATE OF IOWA, EXCEPT FOR THE NAMED CITIES OR COUNTIES LISTED BELOW:)$23.75$16.37$40.12DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
Power equipment operatorPOWER EQUIPMENT OPERATOR: CLASS C- Waterboy, flagman, flagger/traffic control, watchman. ALL OF THE STATE OF IOWA, EXCEPT FOR THE NAMED CITIES AND COUNTIES LISTED BELOW$31.65$14.55$46.20DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and … (the classification continues in the wage determination)$31.85$31.85$63.70DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and … (the classification continues in the wage determination)$31.85$31.85$63.70DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and … (the classification continues in the wage determination)$34.03$14.55$48.58DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and … (the classification continues in the wage determination)$31.85$31.85$63.70DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and … (the classification continues in the wage determination)$31.85$31.85$63.70DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and … (the classification continues in the wage determination)$31.85$31.85$63.70DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel hi … (the classification continues in the wage determination)$34.50$31.85$66.35DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel hi … (the classification continues in the wage determination)$34.50$31.85$66.35DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel hi … (the classification continues in the wage determination)$34.50$31.85$66.35DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: CLASS A- Asphalt laydown machine, Asphalt Plant Operator, Asphalt heater-planer unit, Backhoe, Bulldozer, Central Mix Plant, Concrete Pump, Crawler Tractor Pulling Scraper, Dredge Engineer, Dredge Leverman, Front-end Loader (over 2 yds), Group Equipment Greaser (unsupervised), Horizontal borin … (the classification continues in the wage determination)$34.50$31.85$66.35DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: CLASS A- Asphalt laydown machine, Asphalt Plant Operator, Asphalt heater-planer unit, Backhoe, Bulldozer, Central Mix Plant, Concrete Pump, Crawler Tractor Pulling Scraper, Dredge Engineer, Dredge Leverman, Front-end Loader (over 2 yds), Group Equipment Greaser (unsupervised), Horizontal borin … (the classification continues in the wage determination)$35.73$14.55$50.28DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel hi … (the classification continues in the wage determination)$34.50$31.85$66.35DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (WATERLOO/CEDAR FALLS)$31.91$14.55$46.46DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (SIOUX CITY)$31.91$14.55$46.46DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (LINN COUNTY)$31.91$14.55$46.46DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (IOWA CITY)$31.65$14.55$46.20DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (DUBUQUE COUNTY (INCLUDING CITY OF DUBUQUE) AND JOHNSON COUNTY)$31.65$14.55$46.20DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (COUNCIL BLUFFS)$31.65$14.55$46.20DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination)$34.03$14.55$48.58DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination)$34.03$14.55$48.58DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination)$34.03$14.55$48.58DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination)$34.03$14.55$48.58DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination)$34.03$14.55$48.58DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination)$35.73$14.55$50.28DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination)$35.73$14.55$50.28DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination)$35.73$14.55$50.28DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination)$35.73$14.55$50.28DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination)$35.73$14.55$50.28DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (WATER) CLASS A- Asphalt laydown machine, Asphalt Plant Operator, Asphalt heater-planer unit, Backhoe, Bulldozer, Central Mix Plant, Concrete Pump, Crawler Tractor Pulling Scraper, Dredge Engineer, Dredge Leverman, Front-end Loader (over 2 yds), Group Equipment Greaser (unsupervised), Horizont … (the classification continues in the wage determination)$35.73$14.55$50.28DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (WATERLOO/CEDAR FALLS)$31.91$14.55$46.46DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (SIOUX CITY)$31.91$14.55$46.46DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (LINN COUNTY)$31.91$14.55$46.46DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (IOWA CITY)$31.91$14.55$46.46DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (COUNCIL BLUFFS)$31.91$14.55$46.46DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (DUBUQUE COUNTY (INCLUDING CITY OF DUBUQUE) AND JOHNSON COUNTY)$31.91$14.55$46.46DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS B-Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-joint … (the classification continues in the wage determination)$34.30$14.55$48.85DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination)$34.30$14.55$48.85DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination)$34.30$14.55$48.85DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination)$34.30$14.55$48.85DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination)$34.30$14.55$48.85DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination)$34.30$14.55$48.85DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination)$36.00$14.55$50.55DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination)$36.00$14.55$50.55DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination)$36.00$14.55$50.55DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination)$36.00$14.55$50.55DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS A- Asphalt laydown machine, Asphalt Plant Operator, Asphalt heater-planer unit, Backhoe, Bulldozer, Central Mix Plant, Concrete Pump, Crawler Tractor Pulling Scraper, Dredge Engineer, Dredge Leverman, Front-end Loader (over 2 yds), Group Equipment Greaser (unsupervised), Horizont … (the classification continues in the wage determination)$36.00$14.55$50.55DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
POWER EQUIPMENT OPERATOR: (SEWER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination)$36.00$14.55$50.55DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
OPERATOR: POWER EQUIPMENT: (SEWER) CLASS A- Asphalt laydown machine, Asphalt Plant Operator, Asphalt heater-planer unit, Backhoe, Bulldozer, Central Mix Plant, Concrete Pump, Crawler Tractor Pulling Scraper, Dredge Engineer, Dredge Leverman, Front-end Loader (over 2 yds), Group Equipment Greaser (unsupervised), Horizon … (the classification continues in the wage determination)$36.00$14.55$50.55DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
OPERATOR: POWER EQUIPMENT (WATER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (POLK, WARREN, DALLAS, STORY & JASPER COUNTIES)$31.65$14.55$46.20DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
OPERATOR: POWER EQUIPMENT (WATER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination)$34.03$14.55$48.58DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
OPERATOR: POWER EQUIPMENT (WATER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination)$35.73$14.55$50.28DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
OPERATOR: POWER EQUIPMENT (SEWER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (POLK, WARREN, DALLAS, STORY & JASPER COUNTIES)$31.91$14.55$46.46DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
OPERATOR: POWER EQUIPMENT (SEWER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination)$34.30$14.55$48.85DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
Cement mason / concrete finisherCEMENT MASON (WATERLOO/CEDAR FALLS)$31.68$11.05$42.73DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CEMENT MASON (SIOUX CITY)$34.17$11.05$45.22DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CEMENT MASON (POLK COUNTY)$36.89$11.05$47.94DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CEMENT MASON (MUSCATINE COUNTY)$36.89$11.05$47.94DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CEMENT MASON (LINN COUNTY)$36.89$11.05$47.94DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CEMENT MASON (IOWA CITY)$36.89$11.05$47.94DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CEMENT MASON (FORT MADISON)$35.45$11.05$46.50DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CEMENT MASON (DUBUQUE COUNTY (CITY OF DUBUQUE))$36.98$11.05$48.03DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CEMENT MASON (COUNCIL BLUFFS)$33.55$11.05$44.60DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CEMENT MASON (CLINTON, DUBUQUE, JOHNSON, LOUISA, MUSCATINE, DES MOINES, CEDAR AND LEE COUNTIES, EXCEPT ANY OF THE PREVIOUSLY NAMED CITIES)$31.53$11.05$42.58DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CEMENT MASON (CLINTON COUNTY, CITY OF CLINTON)$36.89$11.05$47.94DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CEMENT MASON (BURLINGTON AND KEOKUK)$36.89$11.05$47.94DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
CEMENT MASON (ALL OF THE STATE OF IOWA, EXCEPT FOR THE NAMED CITIES AND COUTIES LISTED BELOW:)$27.40$11.05$38.45DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
Truck driverTRUCK DRIVERS (WATERLOO/CEDAR FALLS)$24.21$10.50$34.71DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
TRUCK DRIVERS (SIOUX CITY)$23.28$10.50$33.78DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
TRUCK DRIVERS (POLK COUNTY)$25.68$10.50$36.18DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
TRUCK DRIVERS (MUSCATINE COUNTY)$24.59$10.50$35.09DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
TRUCK DRIVERS (LINN COUNTY)$27.10$10.50$37.60DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
TRUCK DRIVERS (IOWA CITY)$26.34$10.50$36.84DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
TRUCK DRIVERS (FORT MADISON)$24.59$10.50$35.09DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
TRUCK DRIVERS (DUBUQUE COUNTY (CITY OF DUBUQUE))$24.06$10.50$34.56DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
TRUCK DRIVERS (COUNCIL BLUFFS)$25.68$10.50$36.18DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
TRUCK DRIVERS (CLINTON, DUBUQUE, JOHNSON, LOUISA, MUSCATINE, DES MOINES, CEDAR AND LEE COUNTIES, EXCEPT ANY OF THE PREVIOUSLY NAMED CITIES)$22.76$10.50$33.26DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
TRUCK DRIVERS (CLINTON COUNTY, CITY OF CLINTON)$25.03$10.50$35.53DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
TRUCK DRIVERS (BURLINGTON AND KEOKUK)$24.59$10.50$35.09DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it
TRUCK DRIVERS (ALL OF THE STATE OF IOWA, EXCEPT FOR THE NAMED CITIES AND COUNTIES LISTED BELOW:)$21.66$10.50$32.16DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it

Residential

IA20260004, modification 1 (published 2026-05-18)

Common trades from this wage determination. It lists 9 classifications in total; the full text is on SAM.gov.

TradeClassificationBaseFringeListed totalWhere the rate comes from
Plumber / pipefitterPLUMBER$14.04$1.54$15.58DOL survey SUIA2008-001, 2008-09-05 — survey rate from 2008; check whether your contract uses it
CarpenterCARPENTER, EXCLUDES FORM WORK$13.72$1.76$15.48DOL survey SUIA2008-001, 2008-09-05 — survey rate from 2008; check whether your contract uses it
LaborerLABORER: MASON TENDER - BRICK$10.00$0.34$10.34DOL survey SUIA2008-001, 2008-09-05 — survey rate from 2008; check whether your contract uses it
LABORER: COMMON OR GENERAL$8.71$0.00$8.71DOL survey SUIA2008-001, 2008-09-05 — survey rate from 2008; check whether your contract uses it
Power equipment operatorOPERATOR: BACKHOE/EXCAVATOR$16.00$0.00$16.00DOL survey SUIA2008-001, 2008-09-05 — survey rate from 2008; check whether your contract uses it
Cement mason / concrete finisherCEMENT MASON/CONCRETE FINISHER$13.73$2.22$15.95DOL survey SUIA2008-001, 2008-09-05 — survey rate from 2008; check whether your contract uses it
Bricklayer / tile / terrazzoBRICKLAYER$29.80$17.16$46.96Union agreement BRIA0003-003, 2025-05-01 · Price a crew using this row
Truck driverTRUCK DRIVER$12.00$0.00$12.00DOL survey SUIA2008-001, 2008-09-05 — survey rate from 2008; check whether your contract uses it

Heavy/Highway

IA20260028, modification 4 (published 2026-06-25)

Common trades from this wage determination. It lists 59 classifications in total; the full text is on SAM.gov.

TradeClassificationBaseFringeListed totalWhere the rate comes from
ElectricianELECTRICIAN (STREET AND HIGHWAY LIGHTING AND TRAFFIC SIGNALS): ZONE 1, 2, AND 3 (ZONE 1 The Counties of Polk, Warren, and Dallas for all Crafts, and Linn County Carpenters only. ZONE 2 The Counties of Dubuque for all Crafts and Linn County for all Crafts except Carpenters. ZONE 3 The Cities of Burlington (including Wes … (the classification continues in the wage determination)$42.90$19.30$62.20State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
ELECTRICIAN (STREET AND HIGHWAY LIGHTING AND TRAFFIC SIGNALS): ZONE 4 (Story, Black Hawk, Cedar, Jasper, Jones, Jackson, Louisa, Madison, and Marion Counties; Clinton County (except the City of Clinton), Johnson County, Muscatine County (except the City of Muscatine), the City of Council Bluffs, Lee County and Des Moin … (the classification continues in the wage determination)$41.60$19.30$60.90State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
ELECTRICIAN (STREET AND HIGHWAY LIGHTING AND TRAFFIC SIGNALS): ZONE 5 (All areas of the state not listed)$40.20$17.80$58.00State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
CarpenterCarpenter & Piledrivermen: ZONE 1 (The Counties of Polk, Warren, and Dallas for all Crafts, and Linn County Carpenters only.)$35.27$18.48$53.75State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
Carpenter & Piledrivermen: ZONE 2 (The Counties of Dubuque for all Crafts and Linn County for all Crafts except Carpenters.)$33.80$18.63$52.43State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
Carpenter & Piledrivermen: ZONE 3 (The Cities of Burlington (including West Burlington), Clinton, Fort Madison, Keokuk, and Middleton (including the Iowa Army Ammunition Plant) and Muscatine (and abutting municipalities of any such cities.)$33.68$18.88$52.56State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
Carpenter & Piledrivermen: ZONE 4 (Story, Black Hawk, Cedar, Jasper, Jones, Jackson, Louisa, Madison, and Marion Counties; Clinton County (except the City of Clinton), Johnson County, Muscatine County (except the City of Muscatine), the City of Council Bluffs, Lee County and Des Moines County.)$33.45$16.25$49.70State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
Carpenter & Piledrivermen: ZONE 5** All areas of the state not listed. (** CARPENTERS AND PILEDRIVERMEN, or IRONWORKERS (ZONE 5) Setting of structural steel; any welding incidental to bridge or culvert construction; setting concrete beams.)$32.90$14.45$47.35State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
LaborerLABORER: GROUP A - Carpenter tender on bridges and box culverts; CCTV* sewer inspection operator; curb machine (without a seat); deck hand; diamond & core drills; drill operator on air tracs, wagon drills, and similar drills; form setter/stringman on paving work; gunnite nozzleman; joint sealer kettleman; laser operato … (the classification continues in the wage determination)$27.18$14.45$41.63State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
LABORER: GROUP A - Carpenter tender on bridges and box culverts; CCTV* sewer inspection operator; curb machine (without a seat); deck hand; diamond & core drills; drill operator on air tracs, wagon drills, and similar drills; form setter/stringman on paving work; gunnite nozzleman; joint sealer kettleman; laser operato … (the classification continues in the wage determination)$25.42$14.45$39.87State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
LABORER: GROUP A - Carpenter tender on bridges and box culverts; CCTV* sewer inspection operator; curb machine (without a seat); deck hand; diamond & core drills; drill operator on air tracs, wagon drills, and similar drills; form setter/stringman on paving work; gunnite nozzleman; joint sealer kettleman; laser operato … (the classification continues in the wage determination)$25.42$14.45$39.87State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
LABORER: GROUP AA - Skilled pipelayer (sewer, water, and conduits) and tunnel laborers; asbestos abatement worker. ZONE 4 (Story, Black Hawk, Cedar, Jasper, Jones, Jackson, Louisa, Madison, and Marion Counties; Clinton County (except the City of Clinton), Johnson County, Muscatine County (except the City of Muscatine), … (the classification continues in the wage determination)$29.85$14.45$44.30State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
LABORER: GROUP AA - Skilled pipelayer (sewer, water, and conduits) and tunnel laborers; asbestos abatement worker. ZONE 5 (All areas of the state not listed)$29.85$14.45$44.30State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
LABORER: GROUP AA - Skilled pipelayer (sewer, water, and conduits) and tunnel laborers; asbestos abatement worker. ZONES 1, 2, & 3 (ZONE 1 The Counties of Polk, Warren, and Dallas for all Crafts, and Linn County Carpenters only. ZONE 2 The Counties of Dubuque for all Crafts and Linn County for all Crafts except Carpent … (the classification continues in the wage determination)$29.85$14.45$44.30State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
LABORER: GROUP B - Air, gas, electric tool operator; barco hammer; carpenter tender; caulker; chain sawman; compressor (under 400 cfm); concrete finisher tender; concrete processing materials and monitors; cutting torch on demolition; drill tender; dumpmen; electric drills; fence erectors; form line expansion joint ass … (the classification continues in the wage determination)$25.33$14.45$39.78State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
LABORER: GROUP B - Air, gas, electric tool operator; barco hammer; carpenter tender; caulker; chain sawman; compressor (under 400 cfm); concrete finisher tender; concrete processing materials and monitors; cutting torch on demolition; drill tender; dumpmen; electric drills; fence erectors; form line expansion joint ass … (the classification continues in the wage determination)$23.57$14.45$38.02State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
LABORER: GROUP B - Air, gas, electric tool operator; barco hammer; carpenter tender; caulker; chain sawman; compressor (under 400 cfm); concrete finisher tender; concrete processing materials and monitors; cutting torch on demolition; drill tender; dumpmen; electric drills; fence erectors; form line expansion joint ass … (the classification continues in the wage determination)$23.57$14.45$38.02State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
LABORER: GROUP C - Scale weigh person; traffic control/flagger, surveillance or monitor; water carrier. ZONE 4 (Story, Black Hawk, Cedar, Jasper, Jones, Jackson, Louisa, Madison, and Marion Counties; Clinton County (except the City of Clinton), Johnson County, Muscatine County (except the City of Muscatine), the City o … (the classification continues in the wage determination)$21.60$14.45$36.05State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
LABORER: GROUP C - Scale weigh person; traffic control/flagger, surveillance or monitor; water carrier. ZONE 5 (All areas of the state not listed).$ 21.60 14.45 LABORER: GROUP C - Scale weigh person; traffic control/flagger, surveillance or monitor; water carrier. ZONES 1, 2, & 3 (ZONE 1 The Counties of Polk, Warren, a … (the classification continues in the wage determination)$22.25$14.45$36.70State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
IronworkerIRONWORKER (SETTING OF STRUCTURAL STEEL) ZONE 1 (The Counties of Polk, Warren, and Dallas for all Crafts, and Linn County Carpenters only.)$33.03$20.72$53.75State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
IRONWORKER (SETTING OF STRUCTURAL STEEL) ZONE 2 (The Counties of Dubuque for all Crafts and Linn County for all Crafts except Carpenters.)$31.32$21.11$52.43State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
IRONWORKER (SETTING OF STRUCTURAL STEEL) ZONE 3 (The Cities of Burlington (including West Burlington), Clinton, Fort Madison, Keokuk, and Middleton (including the Iowa Army Ammunition Plant) and Muscatine (and abutting municipalities of any such cities.)$31.31$21.25$52.56State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
IRONWORKER (SETTING OF STRUCTURAL STEEL) ZONE 4 (Story, Black Hawk, Cedar, Jasper, Jones, Jackson, Louisa, Madison, and Marion Counties; Clinton County (except the City of Clinton), Johnson County, Muscatine County (except the City of Muscatine), the City of Council Bluffs, Lee County and Des Moines County.)$29.49$20.21$49.70State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
IRONWORKER (SETTING OF STRUCTURAL STEEL) ZONE 5** All areas of the state not listed. (** CARPENTERS AND PILEDRIVERMEN, or IRONWORKERS (ZONE 5) Setting of structural steel; any welding incidental to bridge or culvert construction; setting concrete beams.)$28.01$19.34$47.35State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
Power equipment operatorPOWER EQUIPMENT OPERATOR: GROUP A - All terrain (off road) forklift; asphalt breakdown roller (vibratory); asphalt laydown machine; asphalt plant; asphalt screed; bulldozer (finish); central mix plant; concrete pump; crane; crawler tractor pulling scraper; directional drill (60,000 (lbs) pullback and above); dragline a … (the classification continues in the wage determination)$35.32$17.05$52.37State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP A - All terrain (off road) forklift; asphalt breakdown roller (vibratory); asphalt laydown machine; asphalt plant; asphalt screed; bulldozer (finish); central mix plant; concrete pump; crane; crawler tractor pulling scraper; directional drill (60,000 (lbs) pullback and above); dragline a … (the classification continues in the wage determination)$36.50$22.45$58.95State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP A - All terrain (off road) forklift; asphalt breakdown roller (vibratory); asphalt laydown machine; asphalt plant; asphalt screed; bulldozer (finish); central mix plant; concrete pump; crane; crawler tractor pulling scraper; directional drill (60,000 (lbs) pullback and above); dragline a … (the classification continues in the wage determination)$36.50$32.60$69.10State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP A - All terrain (off road) forklift; asphalt breakdown roller (vibratory); asphalt laydown machine; asphalt plant; asphalt screed; bulldozer (finish); central mix plant; concrete pump; crane; crawler tractor pulling scraper; directional drill (60,000 (lbs) pullback and above); dragline a … (the classification continues in the wage determination)$39.82$19.38$59.20State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP A - All terrain (off road) forklift; asphalt breakdown roller (vibratory); asphalt laydown machine; asphalt plant; asphalt screed; bulldozer (finish); central mix plant; concrete pump; crane; crawler tractor pulling scraper; directional drill (60,000 (lbs) pullback and above); dragline a … (the classification continues in the wage determination)$40.17$19.38$59.55State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP B - Articulated off road hauler, asphalt heater/planer; asphalt material transfer vehicle; asphalt roller; belt loader or similar loader; bulldozer (rough); churn or rotary drill; concrete curb machine; crawler tractor pulling ripper, disk or roller; deck hand/oiler; directional drill (l … (the classification continues in the wage determination)$35.36$22.45$57.81State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP B - Articulated off road hauler, asphalt heater/planer; asphalt material transfer vehicle; asphalt roller; belt loader or similar loader; bulldozer (rough); churn or rotary drill; concrete curb machine; crawler tractor pulling ripper, disk or roller; deck hand/oiler; directional drill (l … (the classification continues in the wage determination)$38.22$19.38$57.60State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP B - Articulated off road hauler, asphalt heater/planer; asphalt material transfer vehicle; asphalt roller; belt loader or similar loader; bulldozer (rough); churn or rotary drill; concrete curb machine; crawler tractor pulling ripper, disk or roller; deck hand/oiler; directional drill (l … (the classification continues in the wage determination)$38.62$19.38$58.00State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP B - Articulated off road hauler, asphalt heater/planer; asphalt material transfer vehicle; asphalt roller; belt loader or similar loader; bulldozer (rough); churn or rotary drill; concrete curb machine; crawler tractor pulling ripper, disk or roller; deck hand/oiler; directional drill (l … (the classification continues in the wage determination)$35.20$32.60$67.80State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP B - Articulated off road hauler, asphalt heater/planer; asphalt material transfer vehicle; asphalt roller; belt loader or similar loader; bulldozer (rough); churn or rotary drill; concrete curb machine; crawler tractor pulling ripper, disk or roller; deck hand/oiler; directional drill (l … (the classification continues in the wage determination)$34.28$17.05$51.33State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP C - Boom & winch truck; concrete spreader/belt placer; deep wells for dewatering; farm type tractor (over 75 hp.) pulling disc or roller; forklift; front end loader (under 2 cu. yd.); motor grader (rough); pile hammer power unit; pump (greater than three inch diameter); pumps on well poi … (the classification continues in the wage determination)$32.55$17.05$49.60State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP C - Boom & winch truck; concrete spreader/belt placer; deep wells for dewatering; farm type tractor (over 75 hp.) pulling disc or roller; forklift; front end loader (under 2 cu. yd.); motor grader (rough); pile hammer power unit; pump (greater than three inch diameter); pumps on well poi … (the classification continues in the wage determination)$33.03$22.45$55.48State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP C - Boom & winch truck; concrete spreader/belt placer; deep wells for dewatering; farm type tractor (over 75 hp.) pulling disc or roller; forklift; front end loader (under 2 cu. yd.); motor grader (rough); pile hammer power unit; pump (greater than three inch diameter); pumps on well poi … (the classification continues in the wage determination)$33.70$32.60$66.30State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP C - Boom & winch truck; concrete spreader/belt placer; deep wells for dewatering; farm type tractor (over 75 hp.) pulling disc or roller; forklift; front end loader (under 2 cu. yd.); motor grader (rough); pile hammer power unit; pump (greater than three inch diameter); pumps on well poi … (the classification continues in the wage determination)$36.12$19.38$55.50State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP C - Boom & winch truck; concrete spreader/belt placer; deep wells for dewatering; farm type tractor (over 75 hp.) pulling disc or roller; forklift; front end loader (under 2 cu. yd.); motor grader (rough); pile hammer power unit; pump (greater than three inch diameter); pumps on well poi … (the classification continues in the wage determination)$35.67$19.38$55.05State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP D - Boiler; compressor; cure and texture machine; dow box; farm type or utility tractor (under 75 hp.) pulling disk, roller or other attachments; group greaser tender; light plants; mechanic tender; mechanical broom; mechanical heaters; oiler; pumps (under three inch diameter); tree chip … (the classification continues in the wage determination)$31.55$17.05$48.60State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP D - Boiler; compressor; cure and texture machine; dow box; farm type or utility tractor (under 75 hp.) pulling disk, roller or other attachments; group greaser tender; light plants; mechanic tender; mechanical broom; mechanical heaters; oiler; pumps (under three inch diameter); tree chip … (the classification continues in the wage determination)$33.03$22.45$55.48State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP D - Boiler; compressor; cure and texture machine; dow box; farm type or utility tractor (under 75 hp.) pulling disk, roller or other attachments; group greaser tender; light plants; mechanic tender; mechanical broom; mechanical heaters; oiler; pumps (under three inch diameter); tree chip … (the classification continues in the wage determination)$33.70$32.60$66.30State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP D - Boiler; compressor; cure and texture machine; dow box; farm type or utility tractor (under 75 hp.) pulling disk, roller or other attachments; group greaser tender; light plants; mechanic tender; mechanical broom; mechanical heaters; oiler; pumps (under three inch diameter); tree chip … (the classification continues in the wage determination)$35.67$19.38$55.05State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
POWER EQUIPMENT OPERATOR: GROUP D - Boiler; compressor; cure and texture machine; dow box; farm type or utility tractor (under 75 hp.) pulling disk, roller or other attachments; group greaser tender; light plants; mechanic tender; mechanical broom; mechanical heaters; oiler; pumps (under three inch diameter); tree chip … (the classification continues in the wage determination)$36.12$19.38$55.50State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
Cement mason / concrete finisherCONCRETE FINISHER: ZONE 1 (The Counties of Polk, Warren, and Dallas for all Crafts, and Linn County Carpenters only.)$32.51$16.35$48.86State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
CONCRETE FINISHER: ZONE 2 (The Counties of Dubuque for all Crafts and Linn County for all Crafts except Carpenters.)$32.51$16.35$48.86State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
CONCRETE FINISHER: ZONE 3 (The Cities of Burlington (including West Burlington), Clinton, Fort Madison, Keokuk, and Middleton (including the Iowa Army Ammunition Plant) and Muscatine (and abutting municipalities of any such cities.)$32.51$16.35$48.86State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
CONCRETE FINISHER: ZONE 4 (Story, Black Hawk, Cedar, Jasper, Jones, Jackson, Louisa, Madison, and Marion Counties; Clinton County (except the City of Clinton), Johnson County, Muscatine County (except the City of Muscatine), the City of Council Bluffs, Lee County and Des Moines County.)$30.66$12.58$43.24State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
CONCRETE FINISHER: ZONE 5 (All areas of the state not listed)$29.61$12.58$42.19State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
Bricklayer / tile / terrazzoBRICKLAYER/STONE MASON: ZONE 1 (The Counties of Polk, Warren, and Dallas for all Crafts, and Linn County Carpenters only.)$37.44$19.17$56.61State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
BRICKLAYER/STONE MASON: ZONE 2 (The Counties of Dubuque for all Crafts and Linn County for all Crafts except Carpenters.)$37.44$19.17$56.61State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
BRICKLAYER/STONE MASON: ZONE 3 (The Cities of Burlington (including West Burlington), Clinton, Fort Madison, Keokuk, and Middleton (including the Iowa Army Ammunition Plant) and Muscatine (and abutting municipalities of any such cities.)$37.44$19.17$56.61State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
BRICKLAYER/STONE MASON: ZONE 4 (Story, Black Hawk, Cedar, Jasper, Jones, Jackson, Louisa, Madison, and Marion Counties; Clinton County (except the City of Clinton), Johnson County, Muscatine County (except the City of Muscatine), the City of Council Bluffs, Lee County and Des Moines County.)$35.75$17.85$53.60State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
BRICKLAYER/STONE MASON: ZONE 5 (All areas of the state not listed)$32.65$17.85$50.50State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
Truck driverTRUCK DRIVER (AND PAVEMENT MARKING DRIVER/SWITCHPERSON): ZONE 1 (The Counties of Polk, Warren, and Dallas for all Crafts, and Linn County Carpenters only)$30.25$13.50$43.75State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
TRUCK DRIVER (AND PAVEMENT MARKING DRIVER/SWITCHPERSON): ZONE 2 (The Counties of Dubuque for all Crafts and Linn County for all Crafts except Carpenters)$30.25$13.50$43.75State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
TRUCK DRIVER (AND PAVEMENT MARKING DRIVER/SWITCHPERSON): ZONE 3 (The Cities of Burlington (including West Burlington), Clinton, Fort Madison, Keokuk, and Middleton (including the Iowa Army Ammunition Plant) and Muscatine (and abutting municipalities of any such cities))$30.25$13.50$43.75State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
TRUCK DRIVER (AND PAVEMENT MARKING DRIVER/SWITCHPERSON): ZONE 4 (Story, Black Hawk, Cedar, Jasper, Jones, Jackson, Louisa, Madison, and Marion Counties; Clinton County (except the City of Clinton), Johnson County, Muscatine County (except the City of Muscatine), the City of Council Bluffs, Lee County and Des Moines Cou … (the classification continues in the wage determination)$30.25$12.00$42.25State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row
TRUCK DRIVER (AND PAVEMENT MARKING DRIVER/SWITCHPERSON): ZONE 5 (All areas of the state not listed)$28.41$12.00$40.41State-adopted SAIA2026-001, 2026-05-13 · Price a crew using this row

Building

IA20260032, modification 1 (published 2026-05-18)

Common trades from this wage determination. It lists 30 classifications in total; the full text is on SAM.gov.

TradeClassificationBaseFringeListed totalWhere the rate comes from
ElectricianELECTRICIAN, INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS$23.66$9.20$32.86DOL survey SUIA2016-005, 2016-07-19 — survey rate from 2016; check whether your contract uses it
Plumber / pipefitterPIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION)$46.10$27.05$73.15Union agreement PLUM0025-004, 2025-05-01 · Price a crew using this row
PLUMBER$31.85$15.12$46.97DOL survey SUIA2016-005, 2016-07-19 — survey rate from 2016; check whether your contract uses it
CarpenterCARPENTER (FORM WORK ONLY)$34.25$29.53$63.78Union agreement CARP0004-002, 2025-05-01 · Price a crew using this row
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING (EXCLUDES FORM WORK)$23.25$12.22$35.47DOL survey SUIA2016-005, 2016-07-19 — survey rate from 2016; check whether your contract uses it
MILLWRIGHT$35.93$28.05$63.98Union average UAVGIA0001, 2025-01-01 · Price a crew using this row
LaborerLABORER: MASON TENDER - BRICK$28.57$17.53$46.10Union agreement LABO0538-004, 2024-05-01 · Price a crew using this row
LABORER: PIPELAYER$18.00$2.70$20.70DOL survey SUIA2016-005, 2016-07-19 — survey rate from 2016; check whether your contract uses it
LABORER: LANDSCAPE$14.81$0.00$14.81DOL survey SUIA2016-005, 2016-07-19 — survey rate from 2016; check whether your contract uses it
LABORER: COMMON OR GENERAL$17.25$6.93$24.18DOL survey SUIA2016-005, 2016-07-19 — survey rate from 2016; check whether your contract uses it
IronworkerIRONWORKER: REINFORCING$37.50$30.99$68.49Union agreement IRON0111-002, 2024-07-01 · Price a crew using this row
IRONWORKER: ORNAMENTAL$36.30$25.80$62.10Union agreement IRON0577-001, 2025-06-01 · Price a crew using this row
IRONWORKER, STRUCTURAL$25.29$15.89$41.18DOL survey SUIA2016-005, 2016-07-19 — survey rate from 2016; check whether your contract uses it
Power equipment operatorPOWER EQUIPMENT OPERATOR: CRANE$36.93$21.94$58.87Union agreement ENGI0234-004, 2025-05-01 · Price a crew using this row
POWER EQUIPMENT OPERATOR: (CLASS 2)- FORKLIFT (OTHER THAN THE ABOVE)$34.70$21.94$56.64Union agreement ENGI0234-004, 2025-05-01 · Price a crew using this row
POWER EQUIPMENT OPERATOR: (CLASS 1)- FORKLIFT (ON STEEL ERECTION AND MACHINERY MOVING OR HOISTING ABOVE ONE COMPLETE STORY)$35.02$21.94$56.96Union agreement ENGI0234-004, 2025-05-01 · Price a crew using this row
OPERATOR: LOADER$25.80$17.19$42.99DOL survey SUIA2016-005, 2016-07-19 — survey rate from 2016; check whether your contract uses it
OPERATOR: BULLDOZER$22.31$8.36$30.67DOL survey SUIA2016-005, 2016-07-19 — survey rate from 2016; check whether your contract uses it
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$27.55$22.85$50.40DOL survey SUIA2016-005, 2016-07-19 — survey rate from 2016; check whether your contract uses it
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$27.31$15.35$42.66DOL survey SUIA2016-005, 2016-07-19 — survey rate from 2016; check whether your contract uses it
Cement mason / concrete finisherCEMENT MASON/CONCRETE FINISHER$21.12$11.07$32.19DOL survey SUIA2016-005, 2016-07-19 — survey rate from 2016; check whether your contract uses it
Bricklayer / tile / terrazzoBRICKLAYER$25.93$9.70$35.63DOL survey SUIA2016-005, 2016-07-19 — survey rate from 2016; check whether your contract uses it
PainterPAINTER: BRUSH AND ROLLER$32.41$16.30$48.71Union agreement PAIN0246-001, 2025-05-01 · Price a crew using this row
RooferROOFER$14.00$3.91$17.91DOL survey SUIA2016-005, 2016-07-19 — survey rate from 2016; check whether your contract uses it
Sheet metal workerSHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION)$37.12$22.22$59.34Union agreement SHEE0091-011, 2024-06-01 · Price a crew using this row

Other Iowa counties

Adair · Adams · Allamakee · Audubon · Benton · Black Hawk · Boone · Bremer · Buchanan · Buena Vista · Butler · Calhoun · Carroll · Cass · Cedar · Cerro Gordo · Cherokee · Chickasaw · Clarke · Clay · Clayton · Clinton · Crawford · Dallas · Davis · Decatur · Delaware · Des Moines · Dickinson · Dubuque · Emmet · Fayette · Floyd · Franklin · Fremont · Greene · Grundy · Guthrie · Hamilton · Hancock · Hardin · Harrison · Henry · Howard · Humboldt · Ida · Iowa · Jackson · Jasper · Jefferson · Johnson · Jones · Keokuk · Kossuth · Lee · Linn · Louisa · Lucas · Lyon · Madison · Mahaska · Marion · Marshall · Mills · Mitchell · Monona · Monroe · Montgomery · Muscatine · O'Brien · Osceola · Page · Palo Alto · Plymouth · Pocahontas · Polk · Pottawattamie · Poweshiek · Ringgold · Sac · Scott · Shelby · Sioux · Story · Tama · Taylor · Union · Van Buren · Wapello · Warren · Washington · Wayne · Webster · Winnebago · Winneshiek · Woodbury · Worth · Wright