Iowa · federal rates
Scott County, Iowa: Davis-Bacon wage rates (2026)
5 federal wage determinations cover Scott County. Rates below were taken from SAM.gov on 2026-09-20.
Heavy/Highway
IA20260001, modification 2 (published 2026-07-30)
Common trades from this wage determination. It lists 23 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | CABLE SPLICER | $47.00 | $28.56 | $75.56 | Union agreement ELEC0145-004, 2025-06-02 · Price a crew using this row |
| ELECTRICIAN | $46.00 | $28.56 | $74.56 | Union agreement ELEC0145-004, 2025-06-02 · Price a crew using this row | |
| Carpenter | CARPENTER | $34.67 | $31.94 | $66.61 | Union agreement CARP0004-006, 2025-01-01 · Price a crew using this row |
| PILEDRIVERMAN | $34.67 | $31.94 | $66.61 | Union agreement CARP0004-006, 2025-01-01 · Price a crew using this row | |
| MILLWRIGHT | $39.31 | $29.89 | $69.20 | Union agreement CARP2158-003, 2025-06-01 · Price a crew using this row | |
| Laborer | LABORERS: GROUP 1 (SCOTT COUNTY) FLAGMAN; DUMPMAN; SPOTTER; BROOM MAN; LANDSCAPER; PLANTING & REMOVAL OF TREES; FENCING LABORERS; CLEANING OF FORMS OR LUMBER (IN BONE YARD); LAYING OF SOD; MOVING AND/OR MAINTENANCE OF FLARES & BARRICADES; OPERATION OF ALL HAND, ELECTRIC, AIR, HYDRAULIC OR MECHANICALLY POWERED TOOLS UND … (the classification continues in the wage determination) | $33.77 | $23.60 | $57.37 | Union agreement LABO0309-005, 2024-01-01 · Price a crew using this row |
| LABORERS: GROUP 2 (SCOTT COUNTY) ASPHALT RAKER OR LUTEMAN; PIPE SETTER ON SEWER OR WATER MAIN; GUNNITE NOZZLE MAN; ASPHALT OR CONCRETE CURB MACHINE OPERATOR; CONCRETE BURNING MACHINE OPERATOR; & CORING MACHINE OPERATOR; HAZARDOUS WASTE WORKER; ASBESTOS ABATEMENT WORKER | $34.27 | $23.60 | $57.87 | Union agreement LABO0309-005, 2024-01-01 · Price a crew using this row | |
| LABORERS: GROUP 3 (SCOTT COUNTY) CONCRETE SPECIALIST (ALL WORK RELATING TO BUT NOT LIMITED TO POURING, STRIKING OF & FINISHING ALL CONCRETE SURFACES) | $34.90 | $23.60 | $58.50 | Union agreement LABO0309-005, 2024-01-01 · Price a crew using this row | |
| Ironworker | IRONWORKER | $37.50 | $30.99 | $68.49 | Union agreement IRON0111-001, 2024-07-01 · Price a crew using this row |
| Power equipment operator | POWER EQUIPMENT OPERATORS:, GROUP 1: CRANE (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT | $43.50 | $41.25 | $84.75 | Union agreement ENGI0150-011, 2025-06-01 · Price a crew using this row |
| POWER EQUIPMENT OPERATORS:, GROUP 2: ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILLER (THROW BUCKET); BLASTHOLER SELF-PROPELLED ROTARY DRILL OR SIMILAR MACHINES; BOOM TRACTOR OR SIDE BOOM; BORING MACHINE (DIRECTIONAL, VERTICAL OR HORIZONTAL); BUILDING … (the classification continues in the wage determination) | $41.50 | $41.25 | $82.75 | Union agreement ENGI0150-011, 2025-06-01 · Price a crew using this row | |
| POWER EQUIPMENT OPERATORS:, GROUP 3: ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER (ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMILAR MACHINES; ELEVATOR; FARM-TYPE TRACTOR (WITHOUT POWER ATTACHMENT); FIREMAN & PUMP OPERATOR AT ASPHALT PLANT; FORKLIFT (LESS THAN 6000 LB … (the classification continues in the wage determination) | $38.85 | $41.25 | $80.10 | Union agreement ENGI0150-011, 2025-06-01 · Price a crew using this row | |
| POWER EQUIPMENT OPERATORS:, GROUP 4: AIR COMPRESSOR (400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE, TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER (OTHER THAN STEAM BOILER); SMALL OUTBOARD MOTOR BOAT (SAFETY BOAT & LIFE BOAT); WATER PUMP (MORE THAN ONE WELL POINT PUMP) | $37.80 | $41.25 | $79.05 | Union agreement ENGI0150-011, 2025-06-01 · Price a crew using this row | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER (SCOTT COUNTY) | $33.12 | $28.39 | $61.51 | Union agreement PLAS0018-020, 2025-01-01 · Price a crew using this row |
| Painter | PAINTERS: BRUSH & ROLLER | $31.32 | $19.05 | $50.37 | Union agreement PAIN0081-001, 2024-05-01 · Price a crew using this row |
| PAINTERS: DRYWALL TAPER | $31.82 | $19.05 | $50.87 | Union agreement PAIN0081-001, 2024-05-01 · Price a crew using this row | |
| PAINTERS: ELEVATED TANKS, BRIDGES, STACKS FLAG POLES, MFG, VESSELS (INTERIOR AND EXTERIOR SURFACES.$ 33.32 19.05 PAINTERS: SIGN PAINTERS | $28.05 | $19.05 | $47.10 | Union agreement PAIN0081-001, 2024-05-01 · Price a crew using this row | |
| PAINTERS: SPRAY, STRUCTURAL STEEL AND SANDBLASTING, INDUSTRIAL | $31.82 | $19.05 | $50.87 | Union agreement PAIN0081-001, 2024-05-01 · Price a crew using this row | |
| Truck driver | TRUCK DRIVERS: GROUP 1 (SCOTT COUNTY) DRIVERS ON 2 AXLE TRUCKS HAULING LESS THAN 9 TONS , AIR COMPRESSOR AND WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS, WAREHOUSEMEN, GREASERS AND TIREMEN, PICK- UP-TRUCKS WHEN HAULING MATERIAL, TOOLS OR MEN TO AND FROM AND ON THE JOB SITE, AND FORKLIFTS UP TO … (the classification continues in the wage determination) | $45.35 | $16.11 | $61.46 | Union agreement TEAM0371-001, 2025-07-01 · Price a crew using this row |
| TRUCK DRIVERS: GROUP 2- 2 OR 3 AXLE TRUCKS HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS. A-FRAME WINCH TRUCKS, OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES. FORKLIFTS OVER 6,000 LB CAPACITY, WINCH TRUCKS, FOUR AXLE COMBINATION UNITS, HYDROLIFT TRUCKS, VACTOR TRUCKS OR SIMIOLAR EQUIPMENT WHEN USE … (the classification continues in the wage determination) | $45.93 | $16.11 | $62.04 | Union agreement TEAM0371-001, 2025-07-01 · Price a crew using this row | |
| TRUCK DRIVERS: GROUP 3- 2, 3, AND 4 AXLES HAULING 16 TONS OR MORE, WATER PULLS, 5 AXLES OR MORE COMBINATION UNITS, WATER PULLS, ARTICULATED DUMP TRUCKS FOOTNOTE: PENSION: $52.80 PER DAY IN ADDITIONAL FRINGE BENEFITS | $46.25 | $16.11 | $62.36 | Union agreement TEAM0371-001, 2025-07-01 · Price a crew using this row | |
| TRUCK DRIVERS: GROUP 4 (SCOTT COUNTY) OIL DISTRIBUTORS, LOWBOYS FOOTNOTE: A. PENSION: $52.80 PER DAY | $46.60 | $16.11 | $62.71 | Union agreement TEAM0371-001, 2025-07-01 · Price a crew using this row | |
| TRUCK DRIVERS: GROUP 5 (SCOTT COUNTY) DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK FOOTNOTE: A. PENSION: $52.80 PER DAY | $47.71 | $16.11 | $63.82 | Union agreement TEAM0371-001, 2025-07-01 · Price a crew using this row |
Heavy
IA20260002, modification 2 (published 2026-06-24)
Common trades from this wage determination. It lists 37 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Carpenter | CARPENTER | $34.25 | $29.53 | $63.78 | Union agreement CARP0004-007, 2025-05-01 · Price a crew using this row |
| CARPENTER (MISSISSIPPI RIVER (IOWA SIDE)) | $28.55 | $16.29 | $44.84 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| CARPENTER (MISSISSIPPI RIVER (WORK THAT PERTAINS TO BOTH BANKS, OR EXTENDS ACROSS THE MISSISSIPPI RIVER. IF A HIGHER RATE OF PAY PREVIALIS IN THE ADJOINING STATES, THEN THOSE RATES SHALL APPLY)) | $34.60 | $21.38 | $55.98 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| CARPENTER (MISSOURI RIVER) | $31.25 | $12.43 | $43.68 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| Laborer | LABORERS: GROUP 1 (SCOTT COUNTY) FLAGMAN; DUMPMAN; SPOTTER; BROOM MAN; LANDSCAPER; PLANTING & REMOVAL OF TREES; FENCING LABORERS; CLEANING OF FORMS OR LUMBER (IN BONE YARD); LAYING OF SOD; MOVING AND/OR MAINTENANCE OF FLARES & BARRICADES; OPERATION OF ALL HAND, ELECTRIC, AIR, HYDRAULIC OR MECHANICALLY POWERED TOOLS UND … (the classification continues in the wage determination) | $33.77 | $23.60 | $57.37 | Union agreement LABO0309-005, 2024-01-01 · Price a crew using this row |
| LABORERS: GROUP 2 (SCOTT COUNTY) ASPHALT RAKER OR LUTEMAN; PIPE SETTER ON SEWER OR WATER MAIN; GUNNITE NOZZLE MAN; ASPHALT OR CONCRETE CURB MACHINE OPERATOR; CONCRETE BURNING MACHINE OPERATOR; & CORING MACHINE OPERATOR; HAZARDOUS WASTE WORKER; ASBESTOS ABATEMENT WORKER | $34.27 | $23.60 | $57.87 | Union agreement LABO0309-005, 2024-01-01 · Price a crew using this row | |
| LABORERS: GROUP 3 (SCOTT COUNTY) CONCRETE SPECIALIST (ALL WORK RELATING TO BUT NOT LIMITED TO POURING, STRIKING OF & FINISHING ALL CONCRETE SURFACES) | $34.90 | $23.60 | $58.50 | Union agreement LABO0309-005, 2024-01-01 · Price a crew using this row | |
| LABORERS: CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel highway formsetter … (the classification continues in the wage determination) | $30.92 | $8.60 | $39.52 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| LABORERS: CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel highway formsetter … (the classification continues in the wage determination) | $28.92 | $8.60 | $37.52 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| LABORERS: CLASS AA- Pipelayer, concrete specialist; tunnelman (MISSOURI RIVER) | $29.95 | $8.60 | $38.55 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| LABORERS: CLASS AA- Pipelayer, concrete specialist; tunnelman (MISSISSIPPI RIVER) | $31.95 | $8.60 | $40.55 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| LABORERS: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and painter (striper … (the classification continues in the wage determination) | $29.22 | $8.60 | $37.82 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| LABORERS: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and painter (striper … (the classification continues in the wage determination) | $28.22 | $8.60 | $36.82 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| LABORERS: CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (MISSISSIPPI RIVER) | $26.05 | $8.60 | $34.65 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| LABORERS: CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (MISSOURI RIVER).$ 24.05 8.60 TRUCK DRIVER (MISSISSIPPI RIVER) | $24.88 | $10.50 | $35.38 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| Ironworker | IRONWORKER (EXCLUDING DES MOINES, LEE, DUBUQUE, CLAYTON, ALLAMAKEE, HARRISON, POTTAWATTAMIE, MILLS, FREMONT, JACKSON, CLINTON, LOUISA, MUSCATINE, WOODBURY AND MONONA COUNTIES) | $37.50 | $30.99 | $68.49 | Union agreement IRON0111-005, 2024-07-01 · Price a crew using this row |
| IRONWORKERS: SETTING OF ALL STRUCTURAL STEEL AND REINFORCING STEEL INSTALLATION (DES MOINES AND LEE COUNTIES) | $29.42 | $16.68 | $46.10 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| IRONWORKERS: SETTING OF ALL STRUCTURAL STEEL AND REINFORCING STEEL INSTALLATION (DUBUQUE, CLAYTON & ALLAMAKEE COUNTIES) | $26.67 | $16.68 | $43.35 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| IRONWORKERS: SETTING OF ALL STRUCTURAL STEEL AND REINFORCING STEEL INSTALLATION (HARRISON, POTTAWATTAMIE, MILLS & FREMONT COUNTIES) | $24.89 | $16.68 | $41.57 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| IRONWORKERS: SETTING OF ALL STRUCTURAL STEEL AND REINFORCING STEEL INSTALLATION (JACKSON, CLINTON, LOUISA & MUSCATINE COUNTIES) | $36.20 | $16.68 | $52.88 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| IRONWORKERS: SETTING OF ALL STRUCTURAL STEEL AND REINFORCING STEEL INSTALLATION (WOODBURY & MONONA COUNTIES) | $19.46 | $16.68 | $36.14 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| Power equipment operator | POWER EQUIPMENT OPERATORS: GROUP 1 CRANE (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT (CEDAR, CLINTON, DES MOINES, LEE, LOUISA, MUSCATINE AND SCOTT COUNTIE S) | $43.50 | $41.25 | $84.75 | Union agreement ENGI0150-008, 2025-06-01 · Price a crew using this row |
| POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILLER (THROW BUCKET); BLASTHOLER SELF-PROPELLED ROTARY DRILL OR SIMILAR MACHINES; BOOM TRACTOR OR SIDE BOOM; BORING MACHINE (DIRECTIONAL, VERTICAL OR HORIZONTAL); BUILDING H … (the classification continues in the wage determination) | $37.80 | $41.25 | $79.05 | Union agreement ENGI0150-008, 2025-06-01 · Price a crew using this row | |
| POWER EQUIPMENT OPERATORS: GROUP A (REMAINING COUNTIES MISSISSIPPI RIVER) | $44.07 | $18.15 | $62.22 | Union agreement ENGI0234-002, 2024-12-01 · Price a crew using this row | |
| POWER EQUIPMENT OPERATORS: GROUP A (REMAINING COUNTIES MISSOURI RIVER) | $43.59 | $18.15 | $61.74 | Union agreement ENGI0234-002, 2024-12-01 · Price a crew using this row | |
| POWER EQUIPMENT OPERATORS: GROUP B (REMAINING COUNTIES MISSISSIPPI RIVER) | $43.38 | $18.15 | $61.53 | Union agreement ENGI0234-002, 2024-12-01 · Price a crew using this row | |
| POWER EQUIPMENT OPERATORS: GROUP B (REMAINING COUNTIES MISSOURI RIVER) | $42.92 | $18.15 | $61.07 | Union agreement ENGI0234-002, 2024-12-01 · Price a crew using this row | |
| POWER EQUIPMENT OPERATORS: GROUP C (REMAINING COUNTIES MISSISSIPPI RIVER) | $41.05 | $18.15 | $59.20 | Union agreement ENGI0234-002, 2024-12-01 · Price a crew using this row | |
| POWER EQUIPMENT OPERATORS: GROUP C (REMAINING COUNTIES MISSOURI RIVER) | $40.66 | $18.15 | $58.81 | Union agreement ENGI0234-002, 2024-12-01 · Price a crew using this row | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER (SCOTT COUNTY) | $33.12 | $28.39 | $61.51 | Union agreement PLAS0018-020, 2025-01-01 · Price a crew using this row |
| CEMENT MASON/CONCRETE FINISHER | $33.35 | $10.05 | $43.40 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it | |
| Truck driver | TRUCK DRIVER (MISSOURI RIVER) | $24.88 | $10.50 | $35.38 | DOL survey SUIA2002-002, 2014-12-01 — survey rate from 2014; check whether your contract uses it |
| TRUCK DRIVERS: GROUP 1 (SCOTT COUNTY) DRIVERS ON 2 AXLE TRUCKS HAULING LESS THAN 9 TONS , AIR COMPRESSOR AND WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS, WAREHOUSEMEN, GREASERS AND TIREMEN, PICK- UP-TRUCKS WHEN HAULING MATERIAL, TOOLS OR MEN TO AND FROM AND ON THE JOB SITE, AND FORKLIFTS UP TO … (the classification continues in the wage determination) | $45.35 | $16.11 | $61.46 | Union agreement TEAM0371-001, 2025-07-01 · Price a crew using this row | |
| TRUCK DRIVERS: GROUP 2- 2 OR 3 AXLE TRUCKS HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS. A-FRAME WINCH TRUCKS, OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES. FORKLIFTS OVER 6,000 LB CAPACITY, WINCH TRUCKS, FOUR AXLE COMBINATION UNITS, HYDROLIFT TRUCKS, VACTOR TRUCKS OR SIMIOLAR EQUIPMENT WHEN USE … (the classification continues in the wage determination) | $45.93 | $16.11 | $62.04 | Union agreement TEAM0371-001, 2025-07-01 · Price a crew using this row | |
| TRUCK DRIVERS: GROUP 3- 2, 3, AND 4 AXLES HAULING 16 TONS OR MORE, WATER PULLS, 5 AXLES OR MORE COMBINATION UNITS, WATER PULLS, ARTICULATED DUMP TRUCKS FOOTNOTE: PENSION: $52.80 PER DAY IN ADDITIONAL FRINGE BENEFITS | $46.25 | $16.11 | $62.36 | Union agreement TEAM0371-001, 2025-07-01 · Price a crew using this row | |
| TRUCK DRIVERS: GROUP 4 (SCOTT COUNTY) OIL DISTRIBUTORS, LOWBOYS FOOTNOTE: A. PENSION: $52.80 PER DAY | $46.60 | $16.11 | $62.71 | Union agreement TEAM0371-001, 2025-07-01 · Price a crew using this row | |
| TRUCK DRIVERS: GROUP 5 (SCOTT COUNTY) DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK FOOTNOTE: A. PENSION: $52.80 PER DAY | $47.71 | $16.11 | $63.82 | Union agreement TEAM0371-001, 2025-07-01 · Price a crew using this row |
Heavy
IA20260003, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 119 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Carpenter | CARPENTERS (WATERLOO/CEDAR FALLS) | $29.53 | $17.49 | $47.02 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it |
| CARPENTERS (SIOUX CITY) | $33.33 | $13.68 | $47.01 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CARPENTERS (POLK COUNTY) | $37.53 | $13.54 | $51.07 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CARPENTERS (MUSCATINE COUNTY, CITY OF MUSCATINE) | $27.97 | $18.50 | $46.47 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CARPENTERS (LINN COUNTY) | $33.58 | $17.49 | $51.07 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CARPENTERS (IOWA CITY) | $29.53 | $17.49 | $47.02 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CARPENTERS (FORT MADISON) | $29.53 | $17.49 | $47.02 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CARPENTERS (DUBUQUE COUNTY (CITY OF DUBUQUE)) | $29.53 | $17.49 | $47.02 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CARPENTERS (COUNCIL BLUFFS) | $33.33 | $13.68 | $47.01 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CARPENTERS (CLINTON, DUBUQUE, JOHNSON, LOUISA, MUSCATNE, DES MOINES, CEDAR AND LEE COUNTIES, EXCEPT ANY OF THE PREVIOUSLY NAMED CITIES) | $25.45 | $15.49 | $40.94 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CARPENTERS (CLINTON COUNTY, CITY OF CLINTON) | $29.53 | $17.49 | $47.02 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CARPENTERS (BURLINGTON AND KEOKUK) | $29.53 | $17.49 | $47.02 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CARPENTERS (ALL OF THE STATE OF IOWA, EXCEPT THE NAMED CITIES AND COUNTIES LISTED BELOW:) | $27.26 | $13.68 | $40.94 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| Laborer | LABORERS (WATERLOO/CEDAR FALLS) | $26.89 | $9.38 | $36.27 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it |
| LABORERS (SIOUX CITY) | $26.89 | $9.38 | $36.27 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| LABORERS (POLK COUNTY) | $30.77 | $9.38 | $40.15 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| LABORERS (MUSCATINE COUNTY (CITY OF MUSCATINE)) | $30.35 | $9.38 | $39.73 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| LABORERS (LINN COUNTY) | $30.87 | $9.38 | $40.25 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| LABORERS (IOWA CITY) | $28.35 | $9.38 | $37.73 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| LABORERS (FORT MADISON) | $30.11 | $9.38 | $39.49 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| LABORERS (DUBUQUE COUNTY (CITY OF DUBUQUE)) | $26.89 | $9.38 | $36.27 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| LABORERS (COUNCIL BLUFFS) | $26.89 | $9.38 | $36.27 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| LABORERS (CLINTON, DUUQUE, JOHNSON, LOUISA, MUSCATINE, DES MOINES, CEDAR AND LEE COUNTIES, EXCEPT ANY OF THE PREVIOUSLY NAMED CITIES) | $26.89 | $9.38 | $36.27 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| LABORERS (CLINTON COUNTY, CITY OF CLINTON) | $29.52 | $9.38 | $38.90 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| LABORERS (BURLINGTON AND KEOKUK) | $30.11 | $9.38 | $39.49 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| LABORERS (ALL OF THE STATE OF IOWA, EXCEPT FOR THE NAMED CITIES AND COUNTIES LISTED BELOW:) | $25.14 | $9.38 | $34.52 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| Ironworker | IRONWORKER (WATERLOO/CEDAR FALLS) | $27.53 | $16.37 | $43.90 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it |
| IRONWORKER (SIOUX CITY) | $18.57 | $16.37 | $34.94 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| IRONWORKER (POLK COUNTY) | $27.37 | $16.37 | $43.74 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| IRONWORKER (MUSCATINE COUNTY) | $35.04 | $16.37 | $51.41 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| IRONWORKER (LINN COUNTY) | $27.53 | $16.37 | $43.90 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| IRONWORKER (IOWA CITY) | $27.53 | $16.37 | $43.90 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| IRONWORKER (FORT MADISON) | $28.58 | $16.37 | $44.95 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| IRONWORKER (DUBUQUE COUNTY (CITY OF DUBUQUE)) | $27.53 | $16.37 | $43.90 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| IRONWORKER (COUNCIL BLUFFS) | $24.15 | $16.37 | $40.52 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| IRONWORKER (CLINTON, DUBUQUE, JOHNSON, LOUISA, MUSCATINE, DES MOINES, CEDAR AND LEE COUNTIES, EXCEPT ANY OF THE PREVIOUSLY NAMED CITIES) | $23.75 | $16.37 | $40.12 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| IRONWORKER (CLINTON COUNTY, CITY OF CLINTON) | $35.04 | $16.37 | $51.41 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| IRONWORKER (BURLINGTON AND KEOKUK) | $28.58 | $16.37 | $44.95 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| IRONWORKER (ALL OF THE STATE OF IOWA, EXCEPT FOR THE NAMED CITIES OR COUNTIES LISTED BELOW:) | $23.75 | $16.37 | $40.12 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| Power equipment operator | POWER EQUIPMENT OPERATOR: CLASS C- Waterboy, flagman, flagger/traffic control, watchman. ALL OF THE STATE OF IOWA, EXCEPT FOR THE NAMED CITIES AND COUNTIES LISTED BELOW | $31.65 | $14.55 | $46.20 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it |
| POWER EQUIPMENT OPERATOR: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and … (the classification continues in the wage determination) | $31.85 | $31.85 | $63.70 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and … (the classification continues in the wage determination) | $31.85 | $31.85 | $63.70 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and … (the classification continues in the wage determination) | $34.03 | $14.55 | $48.58 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and … (the classification continues in the wage determination) | $31.85 | $31.85 | $63.70 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and … (the classification continues in the wage determination) | $31.85 | $31.85 | $63.70 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and … (the classification continues in the wage determination) | $31.85 | $31.85 | $63.70 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel hi … (the classification continues in the wage determination) | $34.50 | $31.85 | $66.35 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel hi … (the classification continues in the wage determination) | $34.50 | $31.85 | $66.35 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel hi … (the classification continues in the wage determination) | $34.50 | $31.85 | $66.35 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: CLASS A- Asphalt laydown machine, Asphalt Plant Operator, Asphalt heater-planer unit, Backhoe, Bulldozer, Central Mix Plant, Concrete Pump, Crawler Tractor Pulling Scraper, Dredge Engineer, Dredge Leverman, Front-end Loader (over 2 yds), Group Equipment Greaser (unsupervised), Horizontal borin … (the classification continues in the wage determination) | $34.50 | $31.85 | $66.35 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: CLASS A- Asphalt laydown machine, Asphalt Plant Operator, Asphalt heater-planer unit, Backhoe, Bulldozer, Central Mix Plant, Concrete Pump, Crawler Tractor Pulling Scraper, Dredge Engineer, Dredge Leverman, Front-end Loader (over 2 yds), Group Equipment Greaser (unsupervised), Horizontal borin … (the classification continues in the wage determination) | $35.73 | $14.55 | $50.28 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel hi … (the classification continues in the wage determination) | $34.50 | $31.85 | $66.35 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (WATERLOO/CEDAR FALLS) | $31.91 | $14.55 | $46.46 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (SIOUX CITY) | $31.91 | $14.55 | $46.46 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (LINN COUNTY) | $31.91 | $14.55 | $46.46 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (IOWA CITY) | $31.65 | $14.55 | $46.20 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (DUBUQUE COUNTY (INCLUDING CITY OF DUBUQUE) AND JOHNSON COUNTY) | $31.65 | $14.55 | $46.20 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (COUNCIL BLUFFS) | $31.65 | $14.55 | $46.20 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination) | $34.03 | $14.55 | $48.58 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination) | $34.03 | $14.55 | $48.58 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination) | $34.03 | $14.55 | $48.58 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination) | $34.03 | $14.55 | $48.58 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination) | $34.03 | $14.55 | $48.58 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination) | $35.73 | $14.55 | $50.28 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination) | $35.73 | $14.55 | $50.28 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination) | $35.73 | $14.55 | $50.28 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination) | $35.73 | $14.55 | $50.28 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination) | $35.73 | $14.55 | $50.28 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (WATER) CLASS A- Asphalt laydown machine, Asphalt Plant Operator, Asphalt heater-planer unit, Backhoe, Bulldozer, Central Mix Plant, Concrete Pump, Crawler Tractor Pulling Scraper, Dredge Engineer, Dredge Leverman, Front-end Loader (over 2 yds), Group Equipment Greaser (unsupervised), Horizont … (the classification continues in the wage determination) | $35.73 | $14.55 | $50.28 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (WATERLOO/CEDAR FALLS) | $31.91 | $14.55 | $46.46 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (SIOUX CITY) | $31.91 | $14.55 | $46.46 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (LINN COUNTY) | $31.91 | $14.55 | $46.46 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (IOWA CITY) | $31.91 | $14.55 | $46.46 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (COUNCIL BLUFFS) | $31.91 | $14.55 | $46.46 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (DUBUQUE COUNTY (INCLUDING CITY OF DUBUQUE) AND JOHNSON COUNTY) | $31.91 | $14.55 | $46.46 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS B-Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-joint … (the classification continues in the wage determination) | $34.30 | $14.55 | $48.85 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination) | $34.30 | $14.55 | $48.85 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination) | $34.30 | $14.55 | $48.85 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination) | $34.30 | $14.55 | $48.85 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination) | $34.30 | $14.55 | $48.85 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination) | $34.30 | $14.55 | $48.85 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination) | $36.00 | $14.55 | $50.55 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination) | $36.00 | $14.55 | $50.55 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination) | $36.00 | $14.55 | $50.55 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination) | $36.00 | $14.55 | $50.55 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS A- Asphalt laydown machine, Asphalt Plant Operator, Asphalt heater-planer unit, Backhoe, Bulldozer, Central Mix Plant, Concrete Pump, Crawler Tractor Pulling Scraper, Dredge Engineer, Dredge Leverman, Front-end Loader (over 2 yds), Group Equipment Greaser (unsupervised), Horizont … (the classification continues in the wage determination) | $36.00 | $14.55 | $50.55 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| POWER EQUIPMENT OPERATOR: (SEWER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination) | $36.00 | $14.55 | $50.55 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| OPERATOR: POWER EQUIPMENT: (SEWER) CLASS A- Asphalt laydown machine, Asphalt Plant Operator, Asphalt heater-planer unit, Backhoe, Bulldozer, Central Mix Plant, Concrete Pump, Crawler Tractor Pulling Scraper, Dredge Engineer, Dredge Leverman, Front-end Loader (over 2 yds), Group Equipment Greaser (unsupervised), Horizon … (the classification continues in the wage determination) | $36.00 | $14.55 | $50.55 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| OPERATOR: POWER EQUIPMENT (WATER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (POLK, WARREN, DALLAS, STORY & JASPER COUNTIES) | $31.65 | $14.55 | $46.20 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| OPERATOR: POWER EQUIPMENT (WATER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination) | $34.03 | $14.55 | $48.58 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| OPERATOR: POWER EQUIPMENT (WATER) CLASS A- Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, … (the classification continues in the wage determination) | $35.73 | $14.55 | $50.28 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| OPERATOR: POWER EQUIPMENT (SEWER) CLASS C- Waterboy, flagman, flagger/traffic control, watchman. (POLK, WARREN, DALLAS, STORY & JASPER COUNTIES) | $31.91 | $14.55 | $46.46 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| OPERATOR: POWER EQUIPMENT (SEWER) CLASS B- Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-join … (the classification continues in the wage determination) | $34.30 | $14.55 | $48.85 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| Cement mason / concrete finisher | CEMENT MASON (WATERLOO/CEDAR FALLS) | $31.68 | $11.05 | $42.73 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it |
| CEMENT MASON (SIOUX CITY) | $34.17 | $11.05 | $45.22 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CEMENT MASON (POLK COUNTY) | $36.89 | $11.05 | $47.94 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CEMENT MASON (MUSCATINE COUNTY) | $36.89 | $11.05 | $47.94 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CEMENT MASON (LINN COUNTY) | $36.89 | $11.05 | $47.94 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CEMENT MASON (IOWA CITY) | $36.89 | $11.05 | $47.94 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CEMENT MASON (FORT MADISON) | $35.45 | $11.05 | $46.50 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CEMENT MASON (DUBUQUE COUNTY (CITY OF DUBUQUE)) | $36.98 | $11.05 | $48.03 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CEMENT MASON (COUNCIL BLUFFS) | $33.55 | $11.05 | $44.60 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CEMENT MASON (CLINTON, DUBUQUE, JOHNSON, LOUISA, MUSCATINE, DES MOINES, CEDAR AND LEE COUNTIES, EXCEPT ANY OF THE PREVIOUSLY NAMED CITIES) | $31.53 | $11.05 | $42.58 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CEMENT MASON (CLINTON COUNTY, CITY OF CLINTON) | $36.89 | $11.05 | $47.94 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CEMENT MASON (BURLINGTON AND KEOKUK) | $36.89 | $11.05 | $47.94 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| CEMENT MASON (ALL OF THE STATE OF IOWA, EXCEPT FOR THE NAMED CITIES AND COUTIES LISTED BELOW:) | $27.40 | $11.05 | $38.45 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| Truck driver | TRUCK DRIVERS (WATERLOO/CEDAR FALLS) | $24.21 | $10.50 | $34.71 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it |
| TRUCK DRIVERS (SIOUX CITY) | $23.28 | $10.50 | $33.78 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| TRUCK DRIVERS (POLK COUNTY) | $25.68 | $10.50 | $36.18 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| TRUCK DRIVERS (MUSCATINE COUNTY) | $24.59 | $10.50 | $35.09 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| TRUCK DRIVERS (LINN COUNTY) | $27.10 | $10.50 | $37.60 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| TRUCK DRIVERS (IOWA CITY) | $26.34 | $10.50 | $36.84 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| TRUCK DRIVERS (FORT MADISON) | $24.59 | $10.50 | $35.09 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| TRUCK DRIVERS (DUBUQUE COUNTY (CITY OF DUBUQUE)) | $24.06 | $10.50 | $34.56 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| TRUCK DRIVERS (COUNCIL BLUFFS) | $25.68 | $10.50 | $36.18 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| TRUCK DRIVERS (CLINTON, DUBUQUE, JOHNSON, LOUISA, MUSCATINE, DES MOINES, CEDAR AND LEE COUNTIES, EXCEPT ANY OF THE PREVIOUSLY NAMED CITIES) | $22.76 | $10.50 | $33.26 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| TRUCK DRIVERS (CLINTON COUNTY, CITY OF CLINTON) | $25.03 | $10.50 | $35.53 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| TRUCK DRIVERS (BURLINGTON AND KEOKUK) | $24.59 | $10.50 | $35.09 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it | |
| TRUCK DRIVERS (ALL OF THE STATE OF IOWA, EXCEPT FOR THE NAMED CITIES AND COUNTIES LISTED BELOW:) | $21.66 | $10.50 | $32.16 | DOL survey SUIA2002-004, 2005-12-01 — survey rate from 2005; check whether your contract uses it |
Residential
IA20260019, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 15 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN | $19.60 | $17.81 | $37.41 | Union agreement ELEC0145-014, 2025-09-01 · Price a crew using this row |
| Carpenter | CARPENTER (RATE B: SINGLE FAMILY HOME DUPLEX AND A MULTI-UNIT BUILDING UP TO AND INCLUDING 8 UNITS) | $22.65 | $16.43 | $39.08 | Union agreement CARP0004-001, 2025-07-01 · Price a crew using this row |
| CARPENTER (RATE A: MULTI-UNIT BUILDING WITH MORE THAN 8 UNITS) | $31.27 | $24.23 | $55.50 | Union agreement CARP0004-001, 2025-07-01 · Price a crew using this row | |
| Laborer | LABORER: PIPELAYER | $31.56 | $24.10 | $55.66 | Union agreement LABO0309-008, 2025-05-01 · Price a crew using this row |
| LABORER: MASON TENDER - BRICK | $30.06 | $24.10 | $54.16 | Union agreement LABO0309-008, 2025-05-01 · Price a crew using this row | |
| LABORER: COMMON OR GENERAL | $30.06 | $24.10 | $54.16 | Union agreement LABO0309-008, 2025-05-01 · Price a crew using this row | |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $30.06 | $24.10 | $54.16 | Union agreement LABO0309-008, 2025-05-01 · Price a crew using this row | |
| Power equipment operator | OPERATING ENGINEER: (CLASS 4)- BOBCAT/SKID LOADER NOTE: ENGINEERS OPERATING BACKHOES WITH ATTACHMENTS 4 CUBIC YARDS AND OVER, CRANES WITH ONE HUNDRED FEET (100') OF BOOM OR OVER, OR CRANE WITH FIFTY (50) TON OR OVER RATED LIFTING CAPACITY IS TO RECEIVE AN ADDITIONAL $.75 PER HOUR OVER TH OTHERWISE APPLICABLE PER HOUR W … (the classification continues in the wage determination) | $37.80 | $41.25 | $79.05 | Union agreement ENGI0150-051, 2025-06-01 · Price a crew using this row |
| OPERATING ENGINEER: (CLASS 2)- BACKHOE, BULLDOZER, EXCAVATOR, GRADER/BLADE, LOADER, ROLLER, SCRAPER NOTE: ENGINEERS OPERATING BACKHOES WITH ATTACHMENTS 4 CUBIC YARDS AND OVER, CRANES WITH ONE HUNDRED FEET (100') OF BOOM OR OVER, OR CRANE WITH FIFTY (50) TON OR OVER RATED LIFTING CAPACITY IS TO RECEIVE AN ADDITIONAL $.7 … (the classification continues in the wage determination) | $41.50 | $41.25 | $82.75 | Union agreement ENGI0150-051, 2025-06-01 · Price a crew using this row | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER | $32.29 | $28.45 | $60.74 | Union agreement PLAS0018-009, 2025-05-01 · Price a crew using this row |
| Bricklayer / tile / terrazzo | TILE, MARBLE & TERRAZZO FINISHER | $28.27 | $21.05 | $49.32 | Union agreement BRIA0003-028, 2025-05-01 · Price a crew using this row |
| MARBLE SETTER, TERRAZZO WORKER & TILE SETTER | $32.80 | $20.25 | $53.05 | Union agreement BRIA0003-028, 2025-05-01 · Price a crew using this row | |
| BRICKLAYER | $35.53 | $24.32 | $59.85 | Union agreement BRIA0003-028, 2025-05-01 · Price a crew using this row | |
| Roofer | ROOFER | $38.23 | $23.88 | $62.11 | Union agreement ROOF0032-001, 2025-06-01 · Price a crew using this row |
Building
IA20260073, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 26 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN | $46.00 | $28.56 | $74.56 | Union agreement ELEC0145-009, 2025-06-02 · Price a crew using this row |
| Plumber / pipefitter | PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION) | $46.10 | $27.05 | $73.15 | Union agreement PLUM0025-004, 2025-05-01 · Price a crew using this row |
| PLUMBER | $46.10 | $27.05 | $73.15 | Union agreement PLUM0025-006, 2025-05-01 · Price a crew using this row | |
| Carpenter | CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK) | $34.25 | $29.53 | $63.78 | Union agreement CARP0004-012, 2025-05-01 · Price a crew using this row |
| Laborer | LABORER: PIPELAYER | $31.56 | $24.10 | $55.66 | Union agreement LABO0309-014, 2025-05-01 · Price a crew using this row |
| LABORER: COMMON OR GENERAL | $30.06 | $24.10 | $54.16 | Union agreement LABO0309-014, 2025-05-01 · Price a crew using this row | |
| LABORER: MASON TENDER - BRICK | $19.39 | $8.17 | $27.56 | DOL survey SUIA2016-048, 2016-07-19 — survey rate from 2016; check whether your contract uses it | |
| Ironworker | IRONWORKER: ORNAMENTAL | $35.53 | $24.45 | $59.98 | Union agreement IRON0089-003, 2025-05-01 · Price a crew using this row |
| IRONWORKER (REINFORCING AND STRUCTURAL) | $37.50 | $30.99 | $68.49 | Union agreement IRON0111-009, 2024-07-01 · Price a crew using this row | |
| Power equipment operator | POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $41.50 | $41.25 | $82.75 | Union agreement ENGI0150-038, 2025-06-01 · Price a crew using this row |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $37.80 | $41.25 | $79.05 | Union agreement ENGI0150-041, 2025-06-01 · Price a crew using this row | |
| POWER EQUIPMENT OPERATOR: LOADER; PAVER(ALL TYPES); ROLLER | $41.50 | $41.25 | $82.75 | Union agreement ENGI0150-053, 2025-06-01 · Price a crew using this row | |
| OPERATOR: FORKLIFT | $22.96 | $7.49 | $30.45 | DOL survey SUIA2016-048, 2016-07-19 — survey rate from 2016; check whether your contract uses it | |
| OPERATOR: CRANE | $24.15 | $8.10 | $32.25 | DOL survey SUIA2016-048, 2016-07-19 — survey rate from 2016; check whether your contract uses it | |
| OPERATOR: BULLDOZER | $26.13 | $13.56 | $39.69 | DOL survey SUIA2016-048, 2016-07-19 — survey rate from 2016; check whether your contract uses it | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER | $32.29 | $28.45 | $60.74 | Union agreement PLAS0018-015, 2025-05-01 · Price a crew using this row |
| Bricklayer / tile / terrazzo | TILE SETTER | $32.80 | $20.25 | $53.05 | Union agreement BRIA0003-006, 2025-05-01 · Price a crew using this row |
| BRICKLAYER | $35.53 | $24.32 | $59.85 | Union agreement BRIA0003-029, 2025-05-01 · Price a crew using this row | |
| Painter | PAINTER: BRUSH AND ROLLER ONLY | $31.32 | $19.05 | $50.37 | Union agreement PAIN0676-003, 2024-05-01 · Price a crew using this row |
| PAINTER: SPRAY | $18.61 | $0.00 | $18.61 | DOL survey SUIA2016-048, 2016-07-19 — survey rate from 2016; check whether your contract uses it | |
| Sheet metal worker | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 27.72 13.18 ROOFER | $21.92 | $5.07 | $26.99 | DOL survey SUIA2016-048, 2016-07-19 — survey rate from 2016; check whether your contract uses it |
Next steps
From the rate to the payroll
- Price a crew from these rates — total package, cash in lieu of fringe and overtime on the base rate.
- Report them on Form WH-347 — the weekly federal certified payroll, column by column (Rev. January 2025).
- What Iowa requires for certified payroll — the state report, its cadence and its source, next to the federal rule.
Other Iowa counties
Adair · Adams · Allamakee · Appanoose · Audubon · Benton · Black Hawk · Boone · Bremer · Buchanan · Buena Vista · Butler · Calhoun · Carroll · Cass · Cedar · Cerro Gordo · Cherokee · Chickasaw · Clarke · Clay · Clayton · Clinton · Crawford · Dallas · Davis · Decatur · Delaware · Des Moines · Dickinson · Dubuque · Emmet · Fayette · Floyd · Franklin · Fremont · Greene · Grundy · Guthrie · Hamilton · Hancock · Hardin · Harrison · Henry · Howard · Humboldt · Ida · Iowa · Jackson · Jasper · Jefferson · Johnson · Jones · Keokuk · Kossuth · Lee · Linn · Louisa · Lucas · Lyon · Madison · Mahaska · Marion · Marshall · Mills · Mitchell · Monona · Monroe · Montgomery · Muscatine · O'Brien · Osceola · Page · Palo Alto · Plymouth · Pocahontas · Polk · Pottawattamie · Poweshiek · Ringgold · Sac · Shelby · Sioux · Story · Tama · Taylor · Union · Van Buren · Wapello · Warren · Washington · Wayne · Webster · Winnebago · Winneshiek · Woodbury · Worth · Wright