A project in two counties: organize the wage documents

For a project that crosses a county boundary, connect each work location to the documents in the contract. Do not assume the nearest county page supplies a rate for the whole job.

Fictional project · geography worksheet

One contract, two work locations

A fictional utility corridor crosses from County A into County B. The letters are placeholders, not real jurisdictions. The diagram describes locations only; it assigns no wage determination or rate.

Segment A · before the boundary

County A

Record the state, county, mapped start/end points and the work performed here.

Document reference: to be confirmed from the contract file.

Segment B · after the boundary

County B

Record the second location and the work performed here, even if the same crew continues across the boundary.

Document reference: to be confirmed from the contract file.

Two counties do not necessarily mean two determinations. DOL explains that some general determinations cover multiple counties. For work in more than one county or state, the agency incorporates the applicable determinations or requests a project wage determination, with instructions identifying the work each applies to.

Build a location-to-document index

Keep these records alongside the plans and bid package. Leave missing references unresolved until the contracting agency clarifies them.

Scroll sideways on a small screen to compare the two segments.

Example index — no determination selected
RecordSegment ASegment B
GeographyState, County A, plan sheet and limitsState, County B, plan sheet and limits
Work scopeDescribe the work on this segmentDescribe the work on this segment
Contract documentDetermination number, modification and attachment reference: to confirmDetermination number, modification and attachment reference: to confirm
Application instructionsWhich work does the agency assign to this document?Does the same document cover this segment, or does another apply?
Open questionRecord the question and agency response referenceRecord the question and agency response reference

Three questions for the contracting agency

  1. Geography: do the incorporated documents cover every county and state where the work will occur?
  2. Scope: which construction type and portions of work does each document cover? Where are those instructions in the contract?
  3. Missing coverage: if a location or type of work is absent, what clarification or determination will the agency provide before rates are used?

Browse the existing federal county archive for reference, then check the contract documents and primary sources. County tables do not resolve funding coverage, construction type, or which determination the agency must incorporate.

Primary source

DOL: Davis-Bacon wage determinations — selecting applicable determinations for multiple counties or states