Anoka County, Minnesota: Davis-Bacon wage rates (2026)

3 federal wage determinations cover Anoka County. Rates below were taken from SAM.gov on 2026-09-20.

Local document reading notes

Anoka: the township or city name matters

Residential MN20260020, modification 1 splits its electrician wording inside Anoka County. Record both the municipality name and whether it is a township or city before comparing the text. The two complete classification labels below preserve the exception and the other geographic qualifiers.

Compare the two residential electrician labels

ELEC0110-001 · block date 2024-05-01

ELECTRICIAN (ANOKA (EXCEPT ANOKA & FRIDLEY TOWNSHIPS & THE CITIES OF ANDOVER, ANOKA, COLUMBIA HEIGHTS, COON RAPIDS, FRIDLEY, HILLTOP, RAMSEY & SPRING LAKE PARK), DAKOTA, RAMSEY, SHERBURNE (EAST OF BECKER AND SANTIAGO TWPS), AND WASHINGTON COUNTIES)

ELEC0292-001 · block date 2025-05-01

ELECTRICIAN (ANOKA (ANOKA & FRIDLEY TOWNSHIPS & THE CITIES OF ANDOVER, ANOKA, COLUMBIA HEIGHTS, COON RAPIDS, FRIDLEY, HILLTOP, RAMSEY & SPRING LAKE PARK), CARVER, SCOTT, SHERBURNE (EAST OF HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSISSIPPI RIVER))

Read “EXCEPT” with the entire first list. The second label includes the listed Anoka townships and cities. “Ramsey” inside that Anoka city list is a different reference from Ramsey County elsewhere in the document. These labels help compare source text; they do not select a rate for a project.

Read both blocks in MN20260020/1 on SAM.gov

Source documents in the September 20 archive

Each card identifies one archived determination, its construction type, modification date and county heading. Residential headings specify single family homes and apartments up to and including 4 stories.

Residential

MN20260020 / 1

Modification 1 · 2026-05-18

Counties named: Anoka, Carver, Dakota, Ramsey, Scott, Sherburne and Washington.

Open MN20260020/1 on SAM.gov ↗

Heavy and Highway

MN20260239 / 2

Modification 2 · 2026-07-30

Counties named: Anoka, Carver, Chisago, Dakota, Hennepin, Ramsey, Scott and Washington.

Open MN20260239/2 on SAM.gov ↗

The modification histories start at 0 (2026-01-02), then 1 (2026-05-18); the Building and Heavy and Highway documents also list 2 (2026-07-30). Source text checked November 3, 2026. The rate-table snapshot remains September 20, 2026; this reading check does not establish the latest or contract-required revision.

Back to local reading notes ↑

Residential

MN20260020, modification 1 (published 2026-05-18)

Common trades from this wage determination. It lists 34 classifications in total; the full text is on SAM.gov.

TradeClassificationBaseFringeListed totalWhere the rate comes from
ElectricianELECTRICIAN (ANOKA (EXCEPT ANOKA & FRIDLEY TOWNSHIPS & THE CITIES OF ANDOVER, ANOKA, COLUMBIA HEIGHTS, COON RAPIDS, FRIDLEY, HILLTOP, RAMSEY & SPRING LAKE PARK), DAKOTA, RAMSEY, SHERBURNE (EAST OF BECKER AND SANTIAGO TWPS), AND WASHINGTON COUNTIES)$53.91$36.48$90.39Union agreement ELEC0110-001, 2024-05-01 · Price a crew using this row
ELECTRICIAN (ANOKA (ANOKA & FRIDLEY TOWNSHIPS & THE CITIES OF ANDOVER, ANOKA, COLUMBIA HEIGHTS, COON RAPIDS, FRIDLEY, HILLTOP, RAMSEY & SPRING LAKE PARK), CARVER, SCOTT, SHERBURNE (EAST OF HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSISSIPPI RIVER))$59.00$35.79$94.79Union agreement ELEC0292-001, 2025-05-01 · Price a crew using this row
ELECTRICIAN: ELECTRICAL CONTRACTS UNDER $5 MILLION: (SHERBURNE (WEST OF STATE HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSSISSIPPI RIVER))$43.67$22.35$66.02Union agreement ELEC0292-023, 2023-07-01 · Price a crew using this row
ELECTRICIAN: ELECTRICAL CONTRACTS $5 MILLION AND OVER: (SHERBURNE (WEST OF STATE HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSSISSIPPI RIVER))$44.12$22.57$66.69Union agreement ELEC0292-023, 2023-07-01 · Price a crew using this row
Plumber / pipefitterPLUMBER (ANOKA, CARVER, SCOTT & SHERBURNE (EAST OF A LINE RUNNING NORTHEASTERLY FROM THE POINT OF WRIGHT COUNTY THAT LIES FURTHEST NORTH TO THAT PONT OF MILLE LACS COUNTY THAT IS SOUTH BY WEST)) FOOTNOTE: PAID HOLIDAY: LABOR DAY$59.54$33.26$92.80Union agreement PLUM0015-018, 2025-05-01 · Price a crew using this row
PLUMBER (SHERBURNE (REMAINING WESTERN PORTION)) FOOTNOTE: PAID HOLIDAY: LABOR DAY$53.16$32.21$85.37Union agreement PLUM0015-025, 2025-05-01 · Price a crew using this row
PLUMBER (DAKOTA, RAMSEY, WASHINGTON). FOOTNOTE: PAID HOLIDAY: LABOR DAY$50.23$37.52$87.75Union agreement PLUM0034-017, 2025-05-01 · Price a crew using this row
PIPEFITTER (DAKOTA, RAMSEY, WASHINGTON)$51.70$42.45$94.15Union agreement PLUM0455-002, 2025-05-01 · Price a crew using this row
PIPEFITTER (SHERBURNE COUNTY (WEST OF A LINE RUNNING NORTHEASTERLY FROM THE NORTHERN POINT OF WRIGHT COUNTY TO THE SOUTHWESTERN TIP OF MILLE LACS COUNTY))$48.33$40.46$88.79Union agreement PLUM0539-007, 2024-05-01 · Price a crew using this row
PIPEFITTER (ANOKA, CARVER, SCOTT, SHERBURNE (EAST OF A LINE RUNNING NORTHEASTERLY FROM THE POINT OF WRIGHT COUNTY THAT LIES FURTHEST NORTH TO THAT PONT OF MILLE LACS COUNTY THAT IS SOUTH BY WEST))$48.33$40.46$88.79Union agreement PLUM0539-015, 2024-05-01 · Price a crew using this row
CarpenterCARPENTER (ANOKA, CARVER, DAKOTA, RAMSEY, SCOTT, SHERBURNE (EXCLUDING ST. CLOUD & EXTENDING 5 MILES BEYOND THE CITY LIMITS OF ST. CLOUD), WASHINGTON)$40.63$28.42$69.05Union agreement CARP0322-011, 2024-04-29 · Price a crew using this row
CARPENTER (SHERBURNE (NW PORTION EXTENDING 5 MILES BEYOND THE CITY LIMITS))$40.63$28.42$69.05Union agreement CARP0322-013, 2024-04-29 · Price a crew using this row
CARPENTER (SHERBURNE (EXTREME NW PORTION, INCLUDING ST. CLOUD & EXTENDING 5 MILES BEYOND THE CITY LIMITS))$36.71$20.17$56.88Union agreement CARP0930-014, 2024-04-29 · Price a crew using this row
LaborerLABORER GROUP 2 BOTTOM PERSON, MASON TENDER (BRICK, CEMENT/CONCRETE), PIPELAYER (DAKOTA, RAMSEY, SCOTT, AND WASHINGTON COUNTIES)$32.91$17.44$50.35Union agreement LABO0132-035, 2016-05-09 · Price a crew using this row
LABORER GROUP 1 COMMON OR GENERAL LABORER, ASPHALT RAKER, MASON TENDER (BRICK, CEMENT/CONCRETE), PLASTER TENDER, TOP PERSON (DAKOTA, RAMSEY, SCOTT, AND WASHINGTON COUNTIES)$32.41$17.44$49.85Union agreement LABO0132-035, 2016-05-09 · Price a crew using this row
LABORER GROUP 2 BOTTOM PERSON, MASON TENDER (BRICK, CEMENT/CONCRETE), PIPELAYER$28.96$15.82$44.78Union agreement LABO0563-044, 2012-05-01 · Price a crew using this row
LABORER GROUP 1 COMMON OR GENERAL LABORER, ASPHALT RAKER, MASON TENDER (BRICK, CEMENT/CONCRETE), PLASTER TENDER, TOP PERSON$28.46$15.82$44.28Union agreement LABO0563-044, 2012-05-01 · Price a crew using this row
LABORER: LANDSCAPE$11.50$0.00$11.50DOL survey SUMN2009-057, 2009-07-27 — survey rate from 2009; check whether your contract uses it
IronworkerIRONWORKER: STRUCTURAL$46.35$36.86$83.21Union agreement IRON0512-001, 2025-04-04 · Price a crew using this row
Power equipment operatorOPERATOR: POWER EQUIPMENT GROUP 8 OILER$28.29$15.95$44.24Union agreement ENGI0049-059, 2012-05-01 · Price a crew using this row
OPERATOR: POWER EQUIPMENT GROUP 7 SELF PROPELLED VIBRATING PACKER$30.30$15.95$46.25Union agreement ENGI0049-059, 2012-05-01 · Price a crew using this row
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE$31.42$15.95$47.37Union agreement ENGI0049-059, 2012-05-01 · Price a crew using this row
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2$32.93$15.95$48.88Union agreement ENGI0049-059, 2012-05-01 · Price a crew using this row
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE$33.10$15.95$49.05Union agreement ENGI0049-059, 2012-05-01 · Price a crew using this row
OPERATOR: POWER EQUIPMENT GROUP 3 DRAGLINE$33.44$15.95$49.39Union agreement ENGI0049-059, 2012-05-01 · Price a crew using this row
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE$34.85$15.95$50.80Union agreement ENGI0049-059, 2012-05-01 · Price a crew using this row
PainterPAINTER: SPRAY (DAKOTA, RAMSEY, WASHINGTON COUNTIES)$31.89$17.41$49.30Union agreement PAIN0061-001, 2012-05-01 · Price a crew using this row
PAINTER: SPRAY (ANOKA, CARVER, SCOTT)$31.45$17.85$49.30Union agreement PAIN0386-019, 2012-05-01 · Price a crew using this row
PAINTER: SPRAY (SHERBURNE (SOUTH AND EAST OF A LINE DRAWN BETWEEN THE TOWN OF SANTIAGO IN SHERBURNE COUNTY AND THE TOWN OF CLEARWATER IN WRIGHT COUNTY))$31.45$17.85$49.30Union agreement PAIN0386-022, 2012-05-01 · Price a crew using this row
PAINTER: SPRAY. PROJECTS UNDER $8,000: RECEIVE 80% OF BASIC HOURLY RATE$24.91$13.31$38.22Union agreement PAIN0884-028, 2010-06-01 · Price a crew using this row
RooferROOFER (ANOKA, CARVER, DAKOTA, RAMSEY, SCOTT, WASHINGTON) FOOTNOTE: PAID HOLIDAY: LABOR DAY$48.32$25.54$73.86Union agreement ROOF0096-051, 2025-05-05 · Price a crew using this row
ROOFER (SHERBURNE)$39.01$21.99$61.00Union agreement ROOF0096-053, 2023-06-01 · Price a crew using this row
Sheet metal workerSHEET METAL WORKER (ANOKA, CARVER, DAKOTA, RAMSEY, SCOTT, WASHINGTON) FOOTNOTE: PAID HOLIDAY: LABOR DAY$45.01$26.53$71.54Union agreement SHEE0010-087, 2025-05-01 · Price a crew using this row
SHEET METAL WORKER (SHERBURNE)$35.60$25.14$60.74Union agreement SHEE0010-088, 2025-04-28 · Price a crew using this row

Building

MN20260028, modification 2 (published 2026-07-30)

Common trades from this wage determination. It lists 60 classifications in total; the full text is on SAM.gov.

TradeClassificationBaseFringeListed totalWhere the rate comes from
ElectricianELECTRICIAN$61.39$37.99$99.38State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
Plumber / pipefitterPIPEFITTER/STEAMFITTER$61.24$39.30$100.54State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
PLUMBER$63.84$33.26$97.10State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
CarpenterCARPENTER$51.56$29.84$81.40State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
MILLWRIGHT$46.15$37.81$83.96State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
PILEDRIVER (INCLUDING VIBRATORY DRIVER OR EXTRACTOR FOR PILING AND SHEETING OPERATIONS)$47.71$31.98$79.69State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
LaborerLABORER: COMMON (GENERAL LABOR WORK)$46.25$27.87$74.12State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
LABORER: LANDSCAPING (GARDENER, SOD LAYER AND NURSERY OPERATOR)$31.66$22.78$54.44State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
LABORER: SKILLED (ASSISTING SKILLED CRAFT JOURNEYMAN)$46.25$27.87$74.12State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL)$45.50$26.12$71.62State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
IronworkerIRONWORKER$80.57$5.04$85.61State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
Power equipment operatorPOWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1 : HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INCLUDING JIB$54.21$31.00$85.21State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 2 : CONCRETE PUMP WITH 50 METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TOWER CRANE 200 FEET AND OVER; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET, INCLUDING JIB$53.79$31.00$84.79State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3 : ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK (GUY & STIFFLEG); STATIONARY TOWER CRANE UP TO 200 FEET; SELF-ERECTING TOWER CRANE 100 FEET AND OVER MEASURED FROM BOOM FOOT PIN; TRAVELING TOWER CRANE; TRUCK OR CRAWLER CRANE UP TO AND NOT INCLUD … (the classification continues in the wage determination)$52.08$31.00$83.08State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4 : CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER (THREE DRUMS OR MORE); LOCOMOTIVE; OVERHEAD CRANE ( INSIDE BUILDING PERIMETER); TRACTOR . BOOM TYPE$51.68$31.00$82.68State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 5 : AIR COMPRESSOR 450 CFM OR OVER (TWO OR MORE MACHINES); CONCRETE MIXER; CONCRETE PUMP UP TO 31 METERS/101 FEET OF BOOM; DRILL RIGS, HEAVY ROTARY OR CHURN OR CABLE DRILL WHEN USED FOR CAISSON FOR ELEVATOR OR BUILDING CONSTRUCTION; FORKLIFT; FRONT END, SKID STEER 1 C YD AND O … (the classification continues in the wage determination)$48.52$31.00$79.52State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6 : CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE MACHINE; TRACTOR OPERATOR D2 OR SIMILAR SIZE; TRENCHING MACHINE (SEWER, WATER, GAS) EXCLUDES WALK BEHIND TRENCHER$46.71$31.00$77.71State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 7 : AIR COMPRESSOR 600 CFM OR OVER; BRAKEPERSON; CONCRETE PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER (POWER SHOVEL, CRANE, TRUCK CRANE, DRAGLINE, CRUSHERS AND MILLING MACHINES, OR OTHER SIMILAR POWER EQUIPMENT); PICK UP SWEEP … (the classification continues in the wage determination)$45.34$31.00$76.34State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8 : ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER (TEMPORARY HEAT NO BOILER LICENSE REQUIRED)$41.28$29.40$70.68State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2 : GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED$47.24$29.40$76.64State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3 : ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK (GUY OR STIFFLEG)(POWER)(SKIDS OR STATIONARY); DREDGE OR ENGINEERS, DREDGE (POWER) AND ENGINEER; LOCOMOTIVE CRANE OPERATOR; TANDEM SCRAPER; TUGBOAT 100 H.P AND OVER$46.61$29.40$76.01State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4 : AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE (CMI OR SIMILAR); BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED OR STEEL DRUMMED (EIGHT TONS AND OVER); BITUMINOUS SPREADER AND FINISHING MACHINES (POWER), INCLUDING PAVERS, MACRO SURFACING AND MICRO SURFACING, OR SIM … (the classification continues in the wage determination)$47.68$31.00$78.68State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5 : BITUMINOUS ROLLER (UNDER EIGHT TONS); CONCRETE SAW (MULTIPLE BLADE) (POWER OPERATED); FORM TRENCH DIGGER (POWER); HYDRAULIC LOG SPLITTER; LOADER (BARBER GREENE OR SIMILAR TYPE); POST HOLE DRIVING MACHINE/POST HOLE AUGER; POWER ACTUATED JACK; SELF-PROPELLED CHIP SPREADER … (the classification continues in the wage determination)$42.77$29.40$72.17State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6 : CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL SCREENING PLANT (PORTABLE NOT CRUSHING OR WASHING); LEVER PERSON; POWER SWEEPER; SHEEP FOOT ROLLER AND ROLLERS ON GRAVEL COMPACTION, INCLUDING VIBRATING ROLLERS; TRACTOR, … (the classification continues in the wage determination)$42.60$31.00$73.60State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
Cement mason / concrete finisherCEMENT MASON$52.20$27.22$79.42State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
Bricklayer / tile / terrazzoBRICKLAYER$52.91$28.34$81.25State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
TERRAZZO WORKER$50.80$27.89$78.69State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
TILE FINISHER$39.24$24.88$64.12State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
TILE SETTER$47.52$31.14$78.66State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
PainterPAINTER (INCLUDING HAND BRUSHED, HAND SPRAYED, AND THE TAPING OF PAVEMENT MARKINGS)$48.25$29.09$77.34State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
RooferROOFER$51.32$25.54$76.86State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
Sheet metal workerSHEET METAL WORKER$60.96$35.82$96.78State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
Truck driverTRUCK DRIVER GROUP 1 : MECHANIC . WELDER; TRACTOR TRAILER DRIVER; TRUCK DRIVER (HAULING MACHINERY INCLUDING OPERATION OF HAND AND POWER OPERATED WINCHES)$32.85$9.02$41.87State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
TRUCK DRIVER GROUP 2 : FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK$38.39$23.70$62.09State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
TRUCK DRIVER GROUP 3 : BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR (ONE PERSON OPERATION); THREE AXLE UNITS$22.50$6.50$29.00State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row
TRUCK DRIVER GROUP 4 : BITUMINOUS DISTRIBUTOR SPRAY OPERATOR (REAR AND OILER); DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS; TWO AXLE UNIT; SLURRY OPERATOR; TRACTOR OPERATOR, UNDER 50 H.P$42.53$26.99$69.52State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row

Heavy/Highway

MN20260239, modification 2 (published 2026-07-30)

Common trades from this wage determination. It lists 43 classifications in total; the full text is on SAM.gov.

TradeClassificationBaseFringeListed totalWhere the rate comes from
ElectricianELECTRICIAN$63.59$35.79$99.38State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
LINEMAN$59.36$26.71$86.07State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
Plumber / pipefitterPIPEFITTER/STEAMFITTER$61.24$39.30$100.54State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
PLUMBER$61.28$31.52$92.80State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
CarpenterCARPENTER$50.76$32.17$82.93State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
MILLWRIGHT$46.15$37.81$83.96State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
PILEDRIVER (INCLUDING VIBRATORY DRIVER OR EXTRACTOR FOR PILING AND SHEETING OPERATIONS)$50.90$31.98$82.88State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
LaborerLABORER: COMMON (GENERAL LABOR WORK)$44.00$26.12$70.12State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
LABORER: LANDSCAPING (GARDENER, SOD LAYER AND NURSERY OPERATOR)$31.66$22.78$54.44State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
LABORER: SKILLED (ASSISTING SKILLED CRAFT JOURNEYMAN)$44.00$26.12$70.12State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL)$45.50$26.12$71.62State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
IronworkerIRONWORKER$49.50$37.86$87.36State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
Power equipment operatorPOWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2 : HELICOPTER PILOT; CONCRETE PUMP; ALL CRANES WITH OVER 135-FOOT BOOM, EXCLUDING JIB; DRAGLINE, CRAWLER, HYDRAULIC BACKHOE (TRACK OR WHEEL MOUNTED) AND/OR OTHER SIMILAR EQUIPMENT WITH SHOVEL-TYPE CONTROLS THREE CUBIC YARDS AND OVER MANUFACTURER.S RATED CAPACITY INCLUDING … (the classification continues in the wage determination)$48.71$31.00$79.71State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3 : ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; CONCRETE MIXER, STATIONARY PLANT; DERRICK (GUY OR STIFFLEG)(POWER)(SKIDS OR STATIONARY); DRAGLINE, CRAWLER, HYDRAULIC BACKHOE (TRACK OR WHEEL MOUNTED) AND/OR SIMILAR EQUIPMENT WITH SHOVEL-TYPE CONTROLS, UP TO THREE CUBIC YA … (the classification continues in the wage determination)$48.05$31.00$79.05State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4 : AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE (CMI OR SIMILAR); BACKFILLER OPERATOR; CONCRETE BATCH PLANT OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED OR STEEL DRUMMED (EIGHT TONS AND OVER); BITUMINOUS SPREADER AND FINISHING MACHINES (POWER), INCLUDING PAVERS, MACRO SURFAC … (the classification continues in the wage determination)$47.68$31.00$78.68State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5 : AIR COMPRESSOR, 600 CFM OR OVER; BITUMINOUS ROLLER (UNDER EIGHT TONS); CONCRETE SAW (MULTIPLE BLADE) (POWER OPERATED); FORM TRENCH DIGGER (POWER); FRONT END, SKID STEER UP TO 1C YD; GUNITE GUNALL; HYDRAULIC LOG SPLITTER; LOADER (BARBER GREENE OR SIMILAR TYPE); POST HOLE … (the classification continues in the wage determination)$44.06$31.00$75.06State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6 : CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; CONVEYOR; DREDGE DECK HAND; FIRE PERSON OR TANK CAR HEATER; GRAVEL SCREENING PLANT (PORTABLE NOT CRUSHING OR WASHING); GREASER (TRACTOR); LEVER PERSON; OILER (POWER SHOVEL, CRANE, TRUCK CRANE, DR … (the classification continues in the wage determination)$42.60$31.00$73.60State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
Cement mason / concrete finisherCEMENT MASON$49.63$27.82$77.45State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
Bricklayer / tile / terrazzoBRICKLAYER$52.91$28.34$81.25State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
TILE SETTER$34.76$23.29$58.05State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
PainterPAINTER (INCLUDING HAND BRUSHED, HAND SPRAYED, AND THE TAPING OF PAVEMENT MARKINGS)$50.50$29.09$79.59State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
Sheet metal workerSHEET METAL WORKER$60.96$35.82$96.78State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
Truck driverTRUCK DRIVER GROUP 1 : MECHANIC . WELDER; TRACTOR TRAILER DRIVER; TRUCK DRIVER (HAULING MACHINERY INCLUDING OPERATION OF HAND AND POWER OPERATED WINCHES)$43.29$25.40$68.69State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
TRUCK DRIVER GROUP 2 : FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK$42.63$25.40$68.03State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
TRUCK DRIVER GROUP 3 : BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR (ONE PERSON OPERATION); THREE AXLE UNITS$42.51$25.40$67.91State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row
TRUCK DRIVER GROUP 4 : BITUMINOUS DISTRIBUTOR SPRAY OPERATOR (REAR AND OILER); DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS; TWO AXLE UNIT; SLURRY OPERATOR; TRACTOR OPERATOR, UNDER 50 H.P$42.21$25.40$67.61State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row

Other Minnesota counties

Aitkin · Becker · Beltrami · Benton · Big Stone · Blue Earth · Brown · Carlton · Carver · Cass · Chippewa · Chisago · Clay · Clearwater · Cook · Cottonwood · Crow Wing · Dakota · Dodge · Douglas · Faribault · Fillmore · Freeborn · Goodhue · Grant · Hennepin · Houston · Hubbard · Isanti · Itasca · Jackson · Kanabec · Kandiyohi · Kittson · Koochiching · Lac Qui Parle · Lake · Lake of the Woods · Le Sueur · Lincoln · Lyon · Mahnomen · Marshall · Martin · McLeod · Meeker · Mille Lacs · Morrison · Mower · Murray · Nicollet · Nobles · Norman · Olmsted · Otter Tail · Pennington · Pine · Pipestone · Polk · Pope · Ramsey · Red Lake · Redwood · Renville · Rice · Rock · Roseau · Scott · Sherburne · Sibley · St Louis · Stearns · Steele · Stevens · Swift · Todd · Traverse · Wabasha · Wadena · Waseca · Washington · Watonwan · Wilkin · Winona · Wright · Yellow Medicine