Minnesota · federal rates
Hennepin County, Minnesota: Davis-Bacon wage rates (2026)
3 federal wage determinations cover Hennepin County. Rates below were taken from SAM.gov on 2026-09-20.
Local document reading notes
Hennepin: keep the residential document separate
Hennepin shares Heavy and Highway MN20260239/2 with Anoka and Ramsey, but its Residential document is MN20260019/1. Hennepin is not in the seven-county heading of Residential MN20260020/1 used on the Anoka and Ramsey pages.
- When comparing county files, keep the construction type beside each determination number.
- For the archived Hennepin Residential document, retain MN20260019, modification 1, 2026-05-18.
- Its electrician block is ELEC0292-021, not ELEC0292-001 in MN20260020/1. A shared Heavy and Highway document does not make the Residential sources interchangeable.
Source documents in the September 20 archive
Each card identifies one archived determination, its construction type, modification date and county heading. Residential headings specify single family homes and apartments up to and including 4 stories.
Residential
MN20260019 / 1
Modification 1 · 2026-05-18
Counties named: Hennepin.
Open MN20260019/1 on SAM.gov ↗Building
MN20260053 / 2
Modification 2 · 2026-07-30
Counties named: Hennepin.
Open MN20260053/2 on SAM.gov ↗Heavy and Highway
MN20260239 / 2
Modification 2 · 2026-07-30
Counties named: Anoka, Carver, Chisago, Dakota, Hennepin, Ramsey, Scott and Washington.
Open MN20260239/2 on SAM.gov ↗The modification histories start at 0 (2026-01-02), then 1 (2026-05-18); the Building and Heavy and Highway documents also list 2 (2026-07-30). Source text checked November 3, 2026. The rate-table snapshot remains September 20, 2026; this reading check does not establish the latest or contract-required revision.
Back to local reading notes ↑Residential
MN20260019, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 17 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN | $59.00 | $35.79 | $94.79 | Union agreement ELEC0292-021, 2025-05-01 · Price a crew using this row |
| Plumber / pipefitter | PLUMBER FOOTNOTE: PAID HOLIDAY: LABOR DAY | $59.54 | $33.26 | $92.80 | Union agreement PLUM0015-001, 2025-05-01 · Price a crew using this row |
| Carpenter | CARPENTER | $40.63 | $28.42 | $69.05 | Union agreement CARP0322-019, 2024-04-29 · Price a crew using this row |
| Laborer | LABORER GROUP 2 BOTTOM PERSON, MASON TENDER (BRICK, CEMENT/CONCRETE), PIPELAYER | $28.96 | $15.82 | $44.78 | Union agreement LABO0563-044, 2012-05-01 · Price a crew using this row |
| LABORER GROUP 1 COMMON OR GENERAL LABORER, ASPHALT RAKER, MASON TENDER (BRICK, CEMENT/CONCRETE), PLASTER TENDER, TOP PERSON | $28.46 | $15.82 | $44.28 | Union agreement LABO0563-044, 2012-05-01 · Price a crew using this row | |
| LABORER: LANDSCAPE | $11.50 | $0.00 | $11.50 | DOL survey SUMN2009-056, 2009-07-27 — survey rate from 2009; check whether your contract uses it | |
| Ironworker | IRONWORKER: STRUCTURAL | $46.35 | $36.86 | $83.21 | Union agreement IRON0512-001, 2025-04-04 · Price a crew using this row |
| Power equipment operator | OPERATOR: POWER EQUIPMENT GROUP 8 OILER | $28.29 | $15.95 | $44.24 | Union agreement ENGI0049-059, 2012-05-01 · Price a crew using this row |
| OPERATOR: POWER EQUIPMENT GROUP 7 SELF PROPELLED VIBRATING PACKER | $30.30 | $15.95 | $46.25 | Union agreement ENGI0049-059, 2012-05-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE | $31.42 | $15.95 | $47.37 | Union agreement ENGI0049-059, 2012-05-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 | $32.93 | $15.95 | $48.88 | Union agreement ENGI0049-059, 2012-05-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE | $33.10 | $15.95 | $49.05 | Union agreement ENGI0049-059, 2012-05-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT GROUP 3 DRAGLINE | $33.44 | $15.95 | $49.39 | Union agreement ENGI0049-059, 2012-05-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE | $34.85 | $15.95 | $50.80 | Union agreement ENGI0049-059, 2012-05-01 · Price a crew using this row | |
| Painter | PAINTER (SPRAY) | $31.45 | $17.85 | $49.30 | Union agreement PAIN0386-020, 2012-05-01 · Price a crew using this row |
| Roofer | ROOFER FOOTNOTE: PAID HOLIDAY: LABOR DAY | $48.32 | $25.54 | $73.86 | Union agreement ROOF0096-054, 2025-05-04 · Price a crew using this row |
| Sheet metal worker | SHEET METAL WORKER FOOTNOTE: PAID HOLIDAY - LABOR DAY | $45.01 | $26.53 | $71.54 | Union agreement SHEE0010-004, 2025-05-01 · Price a crew using this row |
Building
MN20260053, modification 2 (published 2026-07-30)
Common trades from this wage determination. It lists 60 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN | $63.59 | $35.79 | $99.38 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row |
| Plumber / pipefitter | PIPEFITTER/STEAMFITTER | $61.24 | $39.30 | $100.54 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row |
| PLUMBER | $63.84 | $33.26 | $97.10 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| Carpenter | CARPENTER | $51.56 | $29.84 | $81.40 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row |
| MILLWRIGHT | $46.15 | $37.81 | $83.96 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| PILEDRIVER (INCLUDING VIBRATORY DRIVER OR EXTRACTOR FOR PILING AND SHEETING OPERATIONS) | $47.71 | $31.98 | $79.69 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| Laborer | LABORER: COMMON (GENERAL LABOR WORK) | $46.25 | $27.87 | $74.12 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row |
| LABORER: LANDSCAPING (GARDENER, SOD LAYER AND NURSERY OPERATOR) | $31.66 | $22.78 | $54.44 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| LABORER: SKILLED (ASSISTING SKILLED CRAFT JOURNEYMAN) | $46.25 | $27.87 | $74.12 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL) | $45.50 | $26.12 | $71.62 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| Ironworker | IRONWORKER | $49.50 | $37.86 | $87.36 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row |
| Power equipment operator | POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1 : HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INCLUDING JIB | $54.21 | $31.00 | $85.21 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 2 : CONCRETE PUMP WITH 50 METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TOWER CRANE 200 FEET AND OVER; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET, INCLUDING JIB | $53.79 | $31.00 | $84.79 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3 : ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK (GUY & STIFFLEG); STATIONARY TOWER CRANE UP TO 200 FEET; SELF-ERECTING TOWER CRANE 100 FEET AND OVER MEASURED FROM BOOM FOOT PIN; TRAVELING TOWER CRANE; TRUCK OR CRAWLER CRANE UP TO AND NOT INCLUD … (the classification continues in the wage determination) | $52.08 | $31.00 | $83.08 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4 : CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER (THREE DRUMS OR MORE); LOCOMOTIVE; OVERHEAD CRANE ( INSIDE BUILDING PERIMETER); TRACTOR . BOOM TYPE | $51.68 | $31.00 | $82.68 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 5 : AIR COMPRESSOR 450 CFM OR OVER (TWO OR MORE MACHINES); CONCRETE MIXER; CONCRETE PUMP UP TO 31 METERS/101 FEET OF BOOM; DRILL RIGS, HEAVY ROTARY OR CHURN OR CABLE DRILL WHEN USED FOR CAISSON FOR ELEVATOR OR BUILDING CONSTRUCTION; FORKLIFT; FRONT END, SKID STEER 1 C YD AND O … (the classification continues in the wage determination) | $48.52 | $31.00 | $79.52 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6 : CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE MACHINE; TRACTOR OPERATOR D2 OR SIMILAR SIZE; TRENCHING MACHINE (SEWER, WATER, GAS) EXCLUDES WALK BEHIND TRENCHER | $46.71 | $31.00 | $77.71 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 7 : AIR COMPRESSOR 600 CFM OR OVER; BRAKEPERSON; CONCRETE PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER (POWER SHOVEL, CRANE, TRUCK CRANE, DRAGLINE, CRUSHERS AND MILLING MACHINES, OR OTHER SIMILAR POWER EQUIPMENT); PICK UP SWEEP … (the classification continues in the wage determination) | $45.34 | $31.00 | $76.34 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8 : ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER (TEMPORARY HEAT NO BOILER LICENSE REQUIRED) | $41.28 | $29.40 | $70.68 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2 : GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED | $47.24 | $29.40 | $76.64 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3 : ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK (GUY OR STIFFLEG)(POWER)(SKIDS OR STATIONARY); DREDGE OR ENGINEERS, DREDGE (POWER) AND ENGINEER; LOCOMOTIVE CRANE OPERATOR; TANDEM SCRAPER; TUGBOAT 100 H.P AND OVER | $46.61 | $29.40 | $76.01 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4 : AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE (CMI OR SIMILAR); BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED OR STEEL DRUMMED (EIGHT TONS AND OVER); BITUMINOUS SPREADER AND FINISHING MACHINES (POWER), INCLUDING PAVERS, MACRO SURFACING AND MICRO SURFACING, OR SIM … (the classification continues in the wage determination) | $47.68 | $31.00 | $78.68 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5 : BITUMINOUS ROLLER (UNDER EIGHT TONS); CONCRETE SAW (MULTIPLE BLADE) (POWER OPERATED); FORM TRENCH DIGGER (POWER); HYDRAULIC LOG SPLITTER; LOADER (BARBER GREENE OR SIMILAR TYPE); POST HOLE DRIVING MACHINE/POST HOLE AUGER; POWER ACTUATED JACK; SELF-PROPELLED CHIP SPREADER … (the classification continues in the wage determination) | $42.77 | $29.40 | $72.17 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6 : CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL SCREENING PLANT (PORTABLE NOT CRUSHING OR WASHING); LEVER PERSON; POWER SWEEPER; SHEEP FOOT ROLLER AND ROLLERS ON GRAVEL COMPACTION, INCLUDING VIBRATING ROLLERS; TRACTOR, … (the classification continues in the wage determination) | $42.60 | $31.00 | $73.60 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| Cement mason / concrete finisher | CEMENT MASON | $52.20 | $27.22 | $79.42 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row |
| Bricklayer / tile / terrazzo | BRICKLAYER | $52.91 | $28.34 | $81.25 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row |
| TERRAZZO WORKER | $50.80 | $27.89 | $78.69 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| TILE FINISHER | $39.24 | $24.88 | $64.12 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| TILE SETTER | $47.52 | $31.14 | $78.66 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| Painter | PAINTER (INCLUDING HAND BRUSHED, HAND SPRAYED, AND THE TAPING OF PAVEMENT MARKINGS) | $48.25 | $29.09 | $77.34 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row |
| Roofer | ROOFER | $51.32 | $25.54 | $76.86 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row |
| Sheet metal worker | SHEET METAL WORKER | $60.96 | $35.82 | $96.78 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row |
| Truck driver | TRUCK DRIVER GROUP 1 : MECHANIC . WELDER; TRACTOR TRAILER DRIVER; TRUCK DRIVER (HAULING MACHINERY INCLUDING OPERATION OF HAND AND POWER OPERATED WINCHES) | $32.85 | $9.02 | $41.87 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row |
| TRUCK DRIVER GROUP 2 : FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK | $38.39 | $23.70 | $62.09 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| TRUCK DRIVER GROUP 3 : BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR (ONE PERSON OPERATION); THREE AXLE UNITS | $22.50 | $6.50 | $29.00 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row | |
| TRUCK DRIVER GROUP 4 : BITUMINOUS DISTRIBUTOR SPRAY OPERATOR (REAR AND OILER); DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS; TWO AXLE UNIT; SLURRY OPERATOR; TRACTOR OPERATOR, UNDER 50 H.P | $42.53 | $26.99 | $69.52 | State-adopted SAMN2025-001, 2025-12-22 · Price a crew using this row |
Heavy/Highway
MN20260239, modification 2 (published 2026-07-30)
Common trades from this wage determination. It lists 43 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN | $63.59 | $35.79 | $99.38 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row |
| LINEMAN | $59.36 | $26.71 | $86.07 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row | |
| Plumber / pipefitter | PIPEFITTER/STEAMFITTER | $61.24 | $39.30 | $100.54 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row |
| PLUMBER | $61.28 | $31.52 | $92.80 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row | |
| Carpenter | CARPENTER | $50.76 | $32.17 | $82.93 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row |
| MILLWRIGHT | $46.15 | $37.81 | $83.96 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row | |
| PILEDRIVER (INCLUDING VIBRATORY DRIVER OR EXTRACTOR FOR PILING AND SHEETING OPERATIONS) | $50.90 | $31.98 | $82.88 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row | |
| Laborer | LABORER: COMMON (GENERAL LABOR WORK) | $44.00 | $26.12 | $70.12 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row |
| LABORER: LANDSCAPING (GARDENER, SOD LAYER AND NURSERY OPERATOR) | $31.66 | $22.78 | $54.44 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row | |
| LABORER: SKILLED (ASSISTING SKILLED CRAFT JOURNEYMAN) | $44.00 | $26.12 | $70.12 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row | |
| UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL) | $45.50 | $26.12 | $71.62 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row | |
| Ironworker | IRONWORKER | $49.50 | $37.86 | $87.36 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row |
| Power equipment operator | POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2 : HELICOPTER PILOT; CONCRETE PUMP; ALL CRANES WITH OVER 135-FOOT BOOM, EXCLUDING JIB; DRAGLINE, CRAWLER, HYDRAULIC BACKHOE (TRACK OR WHEEL MOUNTED) AND/OR OTHER SIMILAR EQUIPMENT WITH SHOVEL-TYPE CONTROLS THREE CUBIC YARDS AND OVER MANUFACTURER.S RATED CAPACITY INCLUDING … (the classification continues in the wage determination) | $48.71 | $31.00 | $79.71 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3 : ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; CONCRETE MIXER, STATIONARY PLANT; DERRICK (GUY OR STIFFLEG)(POWER)(SKIDS OR STATIONARY); DRAGLINE, CRAWLER, HYDRAULIC BACKHOE (TRACK OR WHEEL MOUNTED) AND/OR SIMILAR EQUIPMENT WITH SHOVEL-TYPE CONTROLS, UP TO THREE CUBIC YA … (the classification continues in the wage determination) | $48.05 | $31.00 | $79.05 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row | |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4 : AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE (CMI OR SIMILAR); BACKFILLER OPERATOR; CONCRETE BATCH PLANT OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED OR STEEL DRUMMED (EIGHT TONS AND OVER); BITUMINOUS SPREADER AND FINISHING MACHINES (POWER), INCLUDING PAVERS, MACRO SURFAC … (the classification continues in the wage determination) | $47.68 | $31.00 | $78.68 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row | |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5 : AIR COMPRESSOR, 600 CFM OR OVER; BITUMINOUS ROLLER (UNDER EIGHT TONS); CONCRETE SAW (MULTIPLE BLADE) (POWER OPERATED); FORM TRENCH DIGGER (POWER); FRONT END, SKID STEER UP TO 1C YD; GUNITE GUNALL; HYDRAULIC LOG SPLITTER; LOADER (BARBER GREENE OR SIMILAR TYPE); POST HOLE … (the classification continues in the wage determination) | $44.06 | $31.00 | $75.06 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row | |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6 : CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; CONVEYOR; DREDGE DECK HAND; FIRE PERSON OR TANK CAR HEATER; GRAVEL SCREENING PLANT (PORTABLE NOT CRUSHING OR WASHING); GREASER (TRACTOR); LEVER PERSON; OILER (POWER SHOVEL, CRANE, TRUCK CRANE, DR … (the classification continues in the wage determination) | $42.60 | $31.00 | $73.60 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row | |
| Cement mason / concrete finisher | CEMENT MASON | $49.63 | $27.82 | $77.45 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row |
| Bricklayer / tile / terrazzo | BRICKLAYER | $52.91 | $28.34 | $81.25 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row |
| TILE SETTER | $34.76 | $23.29 | $58.05 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row | |
| Painter | PAINTER (INCLUDING HAND BRUSHED, HAND SPRAYED, AND THE TAPING OF PAVEMENT MARKINGS) | $50.50 | $29.09 | $79.59 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row |
| Sheet metal worker | SHEET METAL WORKER | $60.96 | $35.82 | $96.78 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row |
| Truck driver | TRUCK DRIVER GROUP 1 : MECHANIC . WELDER; TRACTOR TRAILER DRIVER; TRUCK DRIVER (HAULING MACHINERY INCLUDING OPERATION OF HAND AND POWER OPERATED WINCHES) | $43.29 | $25.40 | $68.69 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row |
| TRUCK DRIVER GROUP 2 : FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK | $42.63 | $25.40 | $68.03 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row | |
| TRUCK DRIVER GROUP 3 : BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR (ONE PERSON OPERATION); THREE AXLE UNITS | $42.51 | $25.40 | $67.91 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row | |
| TRUCK DRIVER GROUP 4 : BITUMINOUS DISTRIBUTOR SPRAY OPERATOR (REAR AND OILER); DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS; TWO AXLE UNIT; SLURRY OPERATOR; TRACTOR OPERATOR, UNDER 50 H.P | $42.21 | $25.40 | $67.61 | State-adopted SAMN2025-001, 2025-11-03 · Price a crew using this row |
Next steps
From the rate to the payroll
- Price a crew from these rates — total package, cash in lieu of fringe and overtime on the base rate.
- Report them on Form WH-347 — the weekly federal certified payroll, column by column (Rev. January 2025).
- What Minnesota requires for certified payroll — the state report, its cadence and its source, next to the federal rule.
Other Minnesota counties
Aitkin · Anoka · Becker · Beltrami · Benton · Big Stone · Blue Earth · Brown · Carlton · Carver · Cass · Chippewa · Chisago · Clay · Clearwater · Cook · Cottonwood · Crow Wing · Dakota · Dodge · Douglas · Faribault · Fillmore · Freeborn · Goodhue · Grant · Houston · Hubbard · Isanti · Itasca · Jackson · Kanabec · Kandiyohi · Kittson · Koochiching · Lac Qui Parle · Lake · Lake of the Woods · Le Sueur · Lincoln · Lyon · Mahnomen · Marshall · Martin · McLeod · Meeker · Mille Lacs · Morrison · Mower · Murray · Nicollet · Nobles · Norman · Olmsted · Otter Tail · Pennington · Pine · Pipestone · Polk · Pope · Ramsey · Red Lake · Redwood · Renville · Rice · Rock · Roseau · Scott · Sherburne · Sibley · St Louis · Stearns · Steele · Stevens · Swift · Todd · Traverse · Wabasha · Wadena · Waseca · Washington · Watonwan · Wilkin · Winona · Wright · Yellow Medicine