Utah · federal rates
Juab County, Utah: Davis-Bacon wage rates (2026)
4 federal wage determinations cover Juab County. Rates below were taken from SAM.gov on 2026-09-20.
Residential
UT20260032, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 48 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING FOR PHONE SYSTEMS | $15.65 | $1.98 | $17.63 | DOL survey SUUT2008-047, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Plumber / pipefitter | PLUMBER | $30.60 | $10.85 | $41.45 | Union agreement PLUM0140-015, 2019-08-01 · Price a crew using this row |
| Carpenter | CARPENTER | $15.01 | $0.94 | $15.95 | DOL survey SUUT2008-047, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Laborer | LABORER: COMMON OR GENERAL, CHAIN/CONCRETE SAW, JACKHAMMER AND VIBRATOR | $18.28 | $6.35 | $24.63 | Union agreement LABO0295-027, 2012-07-01 · Price a crew using this row |
| LABORER: MASON TENDER (BRICK AND HOD) | $12.00 | $0.00 | $12.00 | DOL survey SUUT2008-047, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.87 | $0.00 | $12.87 | DOL survey SUUT2008-047, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| LABORER: LANDSCAPE | $10.00 | $0.19 | $10.19 | DOL survey SUUT2008-047, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| LABORER: ASPHALT SHOVELER | $12.95 | $0.00 | $12.95 | DOL survey SUUT2008-047, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| Power equipment operator | OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | $15.65 | $37.15 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | $15.65 | $39.02 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | $15.65 | $40.02 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | $15.65 | $41.02 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | $15.65 | $41.54 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | $15.65 | $43.20 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | $15.65 | $38.06 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: TRACKHOE | $16.14 | $0.00 | $16.14 | DOL survey SUUT2008-047, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER | $16.02 | $0.00 | $16.02 | DOL survey SUUT2008-047, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Bricklayer / tile / terrazzo | BRICKLAYER | $17.41 | $0.00 | $17.41 | DOL survey SUUT2008-047, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Painter | PAINTER: BRUSH, ROLLER AND SPRAY | $15.05 | $0.00 | $15.05 | DOL survey SUUT2008-047, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Roofer | ROOFER | $17.14 | $0.00 | $17.14 | DOL survey SUUT2008-047, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Sheet metal worker | SHEET METAL WORKER | $16.00 | $0.00 | $16.00 | DOL survey SUUT2008-047, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Truck driver | TRUCK DRIVER: WATER, FUEL & OIL TANK (LESS THAN 1,200 GAL.) | $29.37 | $14.65 | $44.02 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (6,000 GAL. TO LESS THAN 10,000 GAL) | $28.60 | $14.65 | $43.25 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (4,000 GAL. TO LESS THAN 6,000 GAL) | $28.33 | $14.65 | $42.98 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (25,000 GAL. AND OVER) | $31.20 | $14.65 | $45.85 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (20,000 GAL. TO LESS THAN 25,000 GAL) | $31.04 | $14.65 | $45.69 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (2,500 GAL. TO LESS THAN 4,000 GAL) | $29.53 | $14.65 | $44.18 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (15,000 GAL. TO LESS THAN 20,000 GAL) | $30.66 | $14.65 | $45.31 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (10,000 GAL. TO LESS THAN 15,000 GAL) | $30.59 | $14.65 | $45.24 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (1,200 GAL. TO LESS THAN 2,500 GAL) | $27.85 | $14.65 | $42.50 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: TRANSIT MIX (OVER 8 CU. YDS. TO 14 CU. YDS) | $29.72 | $14.65 | $44.37 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: TRANSIT MIX (0 CU. YDS. TO 8 CU. YDS).$ 29.62 14.65 TRUCK DRIVER: TIREMEN AND GREASER | $30.19 | $14.65 | $44.84 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: OIL SPREADER | $32.68 | $14.65 | $47.33 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: LOWBOY | $32.69 | $14.65 | $47.34 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (PICKUP TRUCK).$ 29.18 14.65 TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (LESS THAN 10 TONS) | $29.26 | $14.65 | $43.91 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (20 TONS AND OVER) | $29.69 | $14.65 | $44.34 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (15 TONS TO LESS THAN 20 TONS) | $29.53 | $14.65 | $44.18 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (10 TONS TO LESS THAN 15 TONS) | $29.42 | $14.65 | $44.07 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (LESS THAN 8 CU. YDS.) | $29.37 | $14.65 | $44.02 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (95 CU. YDS. TO LESS THAN 105 CU. YDS.) | $30.56 | $14.65 | $45.21 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (8 CU. YDS. TO LESS THAN 14 CU. YDS.) | $29.53 | $14.65 | $44.18 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (75 CU. YDS. TO LESS THAN 95 CU. YDS.) | $30.34 | $14.65 | $44.99 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (55 CU. YDS. TO LESS THAN 75 CU. YDS.) | $30.12 | $14.65 | $44.77 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (35 CU. YDS. TO LESS THAN 55 CU. YDS.) | $29.91 | $14.65 | $44.56 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (14 CU. YDS. TO LESS THAN 35 CU. YDS.) | $29.67 | $14.65 | $44.32 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (105 CU. YDS. TO LESS THAN 130 CU. YDS.) | $30.69 | $14.65 | $45.34 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: CONCRETE PUMPING | $29.62 | $14.65 | $44.27 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: ARTICULATED | $32.14 | $14.65 | $46.79 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row |
Building
UT20260084, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 26 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN | $41.23 | $17.66 | $58.89 | Union agreement ELEC0354-004, 2024-06-01 · Price a crew using this row |
| Plumber / pipefitter | PLUMBER/PIPEFITTER | $46.10 | $15.83 | $61.93 | Union agreement PLUM0140-001, 2025-08-01 · Price a crew using this row |
| Carpenter | CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $31.66 | $13.97 | $45.63 | Union agreement CARP0801-002, 2022-12-01 · Price a crew using this row |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION) | $19.51 | $5.18 | $24.69 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.29 | $1.95 | $23.24 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| Laborer | LABORER: PIPELAYER | $13.57 | $0.00 | $13.57 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.79 | $0.00 | $14.79 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| LABORER: MASON TENDER - BRICK | $16.38 | $1.00 | $17.38 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| LABORER: IRRIGATION | $9.50 | $0.00 | $9.50 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| LABORER: COMMON OR GENERAL | $14.48 | $0.00 | $14.48 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| Ironworker | IRONWORKER, STRUCTURAL | $20.21 | $3.22 | $23.43 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| Power equipment operator | OPERATOR: LOADER | $19.34 | $0.00 | $19.34 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.92 | $0.00 | $16.92 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER | $19.57 | $0.00 | $19.57 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| Bricklayer / tile / terrazzo | TILE SETTER | $23.00 | $0.00 | $23.00 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| TILE FINISHER | $13.54 | $0.00 | $13.54 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| BRICKLAYER | $22.13 | $1.67 | $23.80 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| Painter | PAINTER (SPRAY ONLY) | $26.00 | $8.78 | $34.78 | Union agreement PAIN0077-005, 2025-08-01 · Price a crew using this row |
| PAINTER (BRUSH AND ROLLER, EXCLUDING DRYWALLING/TAPING) | $12.00 | $0.00 | $12.00 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| Roofer | ROOFER | $15.62 | $0.00 | $15.62 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| Sheet metal worker | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $46.79 | $14.89 | $61.68 | Union agreement SHEE0312-002, 2025-07-01 · Price a crew using this row |
| Truck driver | TRUCK DRIVER: DUMP TRUCK | $16.49 | $0.00 | $16.49 | DOL survey SUUT2012-016, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
Heavy
UT20260092, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 10 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN | $41.23 | $17.66 | $58.89 | Union agreement ELEC0354-005, 2024-06-01 · Price a crew using this row |
| Laborer | LABORER: PIPELAYER | $17.76 | $0.00 | $17.76 | DOL survey SUUT2018-003, 2020-05-07 · Price a crew using this row |
| LABORER: COMMON OR GENERAL | $17.65 | $8.59 | $26.24 | DOL survey SUUT2018-003, 2020-05-07 · Price a crew using this row | |
| Power equipment operator | POWER EQUIPMENT OPERATOR (MECHANIC) | $33.04 | $16.09 | $49.13 | Union agreement ENGI0003-034, 2020-07-01 · Price a crew using this row |
| OPERATOR: LOADER | $26.81 | $13.03 | $39.84 | DOL survey SUUT2018-003, 2020-05-07 · Price a crew using this row | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.29 | $0.00 | $25.29 | DOL survey SUUT2018-003, 2020-05-07 · Price a crew using this row | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.44 | $10.04 | $32.48 | DOL survey SUUT2018-003, 2020-05-07 · Price a crew using this row | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER | $19.69 | $1.17 | $20.86 | DOL survey SUUT2018-003, 2020-05-07 · Price a crew using this row |
| Truck driver | TRUCK DRIVER: DUMP TRUCK | $21.80 | $11.41 | $33.21 | DOL survey SUUT2018-003, 2020-05-07 · Price a crew using this row |
Highway
UT20260107, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 35 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $27.45 | $2.30 | $29.75 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row |
| Carpenter | CARPENTER (EXCLUDES FORM WORK) | $32.17 | $17.50 | $49.67 | Union agreement CARP0801-003, 2024-07-01 · Price a crew using this row |
| CARPENTER (FORM WORK ONLY) | $22.59 | $5.41 | $28.00 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| Laborer | TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.59 | $8.65 | $29.24 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row |
| LABORER: PIPELAYER | $17.23 | $2.79 | $20.02 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.46 | $2.64 | $16.10 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| LABORER: LANDSCAPE | $15.40 | $2.53 | $17.93 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| LABORER: COMMON OR GENERAL | $22.83 | $12.25 | $35.08 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $23.83 | $5.92 | $29.75 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| Ironworker | IRONWORKER, REINFORCING | $26.61 | $13.76 | $40.37 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row |
| Power equipment operator | POWER EQUIPMENT OPERATOR (OILER) | $31.99 | $17.64 | $49.63 | Union agreement ENGI0003-021, 2022-07-01 · Price a crew using this row |
| OPERATOR: PAVEMENT MARKING GRINDER | $27.95 | $7.05 | $35.00 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| OPERATOR: SCREED | $23.95 | $12.17 | $36.12 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| OPERATOR: ROLLER | $23.16 | $12.31 | $35.47 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.37 | $15.65 | $40.02 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| OPERATOR: MILLING MACHINE | $26.78 | $15.65 | $42.43 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| OPERATOR: MECHANIC | $26.92 | $13.23 | $40.15 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| OPERATOR: LOADER | $24.86 | $12.91 | $37.77 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| OPERATOR: GRADER/BLADE | $27.33 | $15.42 | $42.75 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| OPERATOR: DRILL | $27.44 | $15.65 | $43.09 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| OPERATOR: CRANE | $30.66 | $10.61 | $41.27 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| OPERATOR: CONCRETE FINISHING MACHINE | $20.03 | $6.55 | $26.58 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| OPERATOR: BROOM/SWEEPER | $14.52 | $7.83 | $22.35 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $23.97 | $10.06 | $34.03 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.28 | $5.64 | $27.92 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER | $20.59 | $2.41 | $23.00 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row |
| Painter | HIGHWAY/PARKING LOT STRIPING: PAINTER | $17.60 | $2.53 | $20.13 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row |
| Truck driver | TRUCK DRIVER: WATER TRUCK | $24.35 | $11.73 | $36.08 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row |
| TRUCK DRIVER: VACTOR | $23.40 | $0.00 | $23.40 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $25.68 | $11.25 | $36.93 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK | $24.09 | $13.04 | $37.13 | DOL survey SUUT2019-019, 2023-04-03 · Price a crew using this row |
Next steps
From the rate to the payroll
- Price a crew from these rates — total package, cash in lieu of fringe and overtime on the base rate.
- Report them on Form WH-347 — the weekly federal certified payroll, column by column (Rev. January 2025).
- What Utah requires for certified payroll — the state report, its cadence and its source, next to the federal rule.
Other Utah counties
Beaver · Box Elder · Cache · Carbon · Daggett · Davis · Duchesne · Emery · Garfield · Grand · Iron · Kane · Millard · Morgan · Piute · Rich · Salt Lake · San Juan · Sanpete · Sevier · Summit · Tooele · Uintah · Utah · Wasatch · Washington · Wayne · Weber