Utah · federal rates
Morgan County, Utah: Davis-Bacon wage rates (2026)
4 federal wage determinations cover Morgan County. Rates below were taken from SAM.gov on 2026-09-20.
Residential
UT20260033, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 49 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN | $15.65 | $1.98 | $17.63 | DOL survey SUUT2008-048, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Plumber / pipefitter | PLUMBER | $30.60 | $10.85 | $41.45 | Union agreement PLUM0140-015, 2019-08-01 · Price a crew using this row |
| Carpenter | CARPENTER, INCLUDES VINYL SIDING INSTALLATION | $13.80 | $0.00 | $13.80 | DOL survey SUUT2008-048, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Laborer | LABORER: COMMON OR GENERAL, CHAIN/CONCRETE SAW, JACKHAMMER AND VIBRATOR | $18.28 | $6.35 | $24.63 | Union agreement LABO0295-027, 2012-07-01 · Price a crew using this row |
| LABORER: MASON TENDER (BRICK AND HOD) | $12.00 | $0.00 | $12.00 | DOL survey SUUT2008-048, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.87 | $0.00 | $12.87 | DOL survey SUUT2008-048, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| LABORER: LANDSCAPE | $10.00 | $0.19 | $10.19 | DOL survey SUUT2008-048, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| LABORER: ASPHALT SHOVELER | $12.95 | $0.00 | $12.95 | DOL survey SUUT2008-048, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| Power equipment operator | OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | $15.65 | $37.15 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | $15.65 | $39.02 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | $15.65 | $40.02 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | $15.65 | $41.02 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | $15.65 | $41.54 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | $15.65 | $43.20 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | $15.65 | $38.06 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: TRACKHOE | $16.14 | $0.00 | $16.14 | DOL survey SUUT2008-048, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER | $14.00 | $1.40 | $15.40 | DOL survey SUUT2008-048, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Bricklayer / tile / terrazzo | BRICKLAYER | $17.41 | $0.00 | $17.41 | DOL survey SUUT2008-048, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Painter | PAINTER: BRUSH, ROLLER AND SPRAY | $17.50 | $0.86 | $18.36 | DOL survey SUUT2008-048, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Roofer | ROOFER | $17.14 | $0.00 | $17.14 | DOL survey SUUT2008-048, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Sheet metal worker | SHEET METAL WORKER | $16.00 | $0.00 | $16.00 | DOL survey SUUT2008-048, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Truck driver | TRUCK DRIVER: WATER, FUEL & OIL TANK (LESS THAN 1,200 GAL.) | $29.37 | $14.65 | $44.02 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (6,000 GAL. TO LESS THAN 10,000 GAL) | $28.60 | $14.65 | $43.25 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (4,000 GAL. TO LESS THAN 6,000 GAL) | $28.33 | $14.65 | $42.98 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (25,000 GAL. AND OVER) | $31.20 | $14.65 | $45.85 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (20,000 GAL. TO LESS THAN 25,000 GAL) | $31.04 | $14.65 | $45.69 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (2,500 GAL. TO LESS THAN 4,000 GAL) | $29.53 | $14.65 | $44.18 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (15,000 GAL. TO LESS THAN 20,000 GAL) | $30.66 | $14.65 | $45.31 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (10,000 GAL. TO LESS THAN 15,000 GAL) | $30.59 | $14.65 | $45.24 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (1,200 GAL. TO LESS THAN 2,500 GAL) | $27.85 | $14.65 | $42.50 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: TRANSIT MIX (OVER 8 CU. YDS. TO 14 CU. YDS) | $29.72 | $14.65 | $44.37 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: TRANSIT MIX (0 CU. YDS. TO 8 CU. YDS).$ 29.62 14.65 TRUCK DRIVER: TIREMEN AND GREASER | $30.19 | $14.65 | $44.84 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: OIL SPREADER | $32.68 | $14.65 | $47.33 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: LOWBOY | $32.69 | $14.65 | $47.34 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (PICKUP TRUCK).$ 29.18 14.65 TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (LESS THAN 10 TONS) | $29.26 | $14.65 | $43.91 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (20 TONS AND OVER) | $29.69 | $14.65 | $44.34 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (15 TONS TO LESS THAN 20 TONS) | $29.53 | $14.65 | $44.18 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (10 TONS TO LESS THAN 15 TONS) | $29.42 | $14.65 | $44.07 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (LESS THAN 8 CU. YDS.) | $29.37 | $14.65 | $44.02 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (95 CU. YDS. TO LESS THAN 105 CU. YDS.) | $30.56 | $14.65 | $45.21 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (8 CU. YDS. TO LESS THAN 14 CU. YDS.) | $29.53 | $14.65 | $44.18 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (75 CU. YDS. TO LESS THAN 95 CU. YDS.) | $30.34 | $14.65 | $44.99 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (55 CU. YDS. TO LESS THAN 75 CU. YDS.) | $30.12 | $14.65 | $44.77 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (35 CU. YDS. TO LESS THAN 55 CU. YDS.) | $29.91 | $14.65 | $44.56 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (14 CU. YDS. TO LESS THAN 35 CU. YDS.) | $29.67 | $14.65 | $44.32 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (105 CU. YDS. TO LESS THAN 130 CU. YDS.) | $30.69 | $14.65 | $45.34 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: CONCRETE PUMPING | $29.62 | $14.65 | $44.27 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: ARTICULATED | $32.14 | $14.65 | $46.79 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row |
Building
UT20260089, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 27 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN | $41.23 | $17.66 | $58.89 | Union agreement ELEC0354-001, 2024-06-01 · Price a crew using this row |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $31.86 | $15.83 | $47.69 | Union agreement ELEC0354-001, 2024-06-01 · Price a crew using this row | |
| ELECTRICIAN | $41.23 | $17.66 | $58.89 | Union agreement ELEC0354-001, 2025-06-11 · Price a crew using this row | |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $31.86 | $15.83 | $47.69 | Union agreement ELEC0354-001, 2025-06-11 · Price a crew using this row | |
| Plumber / pipefitter | PLUMBER/PIPEFITTER | $46.10 | $15.83 | $61.93 | Union agreement PLUM0140-001, 2025-08-01 · Price a crew using this row |
| Carpenter | CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $31.66 | $13.97 | $45.63 | Union agreement CARP0801-002, 2022-12-01 · Price a crew using this row |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION) | $20.68 | $5.49 | $26.17 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.00 | $3.20 | $24.20 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| Laborer | LABORER: PIPELAYER | $13.57 | $0.00 | $13.57 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.87 | $0.14 | $14.01 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| LABORER: MASON TENDER - BRICK | $16.38 | $1.00 | $17.38 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| LABORER: IRRIGATION | $9.50 | $0.00 | $9.50 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| LABORER: COMMON OR GENERAL | $12.78 | $0.00 | $12.78 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| Ironworker | IRONWORKER, STRUCTURAL | $20.21 | $3.22 | $23.43 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| Power equipment operator | OPERATOR: LOADER | $19.34 | $0.00 | $19.34 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.92 | $0.00 | $16.92 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER | $16.00 | $0.00 | $16.00 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| Bricklayer / tile / terrazzo | TILE SETTER | $23.00 | $0.00 | $23.00 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| TILE FINISHER | $13.54 | $0.00 | $13.54 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| BRICKLAYER | $22.13 | $1.67 | $23.80 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| Painter | PAINTER (BRUSH, ROLLER AND SPRAY, EXCLUDING DRYWALLING/TAPING) | $15.33 | $0.00 | $15.33 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| Roofer | ROOFER | $15.62 | $0.00 | $15.62 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| Sheet metal worker | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $46.79 | $14.89 | $61.68 | Union agreement SHEE0312-002, 2025-07-01 · Price a crew using this row |
| Truck driver | TRUCK DRIVER: DUMP TRUCK | $17.74 | $2.66 | $20.40 | DOL survey SUUT2012-021, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
Heavy
UT20260096, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 10 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN | $41.23 | $17.66 | $58.89 | Union agreement ELEC0354-005, 2024-06-01 · Price a crew using this row |
| Laborer | LABORER: PIPELAYER | $14.68 | $1.96 | $16.64 | DOL survey SUUT2018-007, 2020-05-07 · Price a crew using this row |
| LABORER: COMMON OR GENERAL | $20.39 | $3.29 | $23.68 | DOL survey SUUT2018-007, 2020-05-07 · Price a crew using this row | |
| Power equipment operator | POWER EQUIPMENT OPERATOR (MECHANIC) | $33.04 | $16.09 | $49.13 | Union agreement ENGI0003-034, 2020-07-01 · Price a crew using this row |
| OPERATOR: LOADER | $24.02 | $5.67 | $29.69 | DOL survey SUUT2018-007, 2020-05-07 · Price a crew using this row | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.29 | $0.00 | $25.29 | DOL survey SUUT2018-007, 2020-05-07 · Price a crew using this row | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.61 | $5.17 | $29.78 | DOL survey SUUT2018-007, 2020-05-07 · Price a crew using this row | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER | $19.69 | $1.17 | $20.86 | DOL survey SUUT2018-007, 2020-05-07 · Price a crew using this row |
| Truck driver | TRUCK DRIVER: DUMP TRUCK | $29.67 | $14.65 | $44.32 | Union agreement TEAM0222-004, 2024-07-01 · Price a crew using this row |
Highway
UT20260108, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 34 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $32.24 | $7.85 | $40.09 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row |
| Carpenter | CARPENTER, INCLUDES FORM WORK | $22.84 | $4.64 | $27.48 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row |
| Laborer | TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.59 | $7.56 | $28.15 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row |
| LABORER: GRADE CHECKER | $21.21 | $6.30 | $27.51 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| LABORER: PIPELAYER | $17.13 | $3.54 | $20.67 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.36 | $2.53 | $19.89 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| LABORER: LANDSCAPE | $14.76 | $2.53 | $17.29 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| LABORER: COMMON OR GENERAL | $20.08 | $7.06 | $27.14 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $21.97 | $8.65 | $30.62 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| Ironworker | IRONWORKER, REINFORCING | $26.61 | $13.76 | $40.37 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row |
| Power equipment operator | OPERATOR: PAVEMENT MARKING GRINDER | $24.37 | $15.65 | $40.02 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row |
| OPERATOR: SCREED | $24.45 | $15.65 | $40.10 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| OPERATOR: ROLLER | $23.63 | $15.65 | $39.28 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.40 | $15.65 | $40.05 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| OPERATOR: OILER | $22.18 | $9.73 | $31.91 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| OPERATOR: MILLING MACHINE | $23.58 | $15.65 | $39.23 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| OPERATOR: MECHANIC | $30.40 | $15.65 | $46.05 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| OPERATOR: LOADER | $23.78 | $15.65 | $39.43 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| OPERATOR: GRADER/BLADE | $27.87 | $15.65 | $43.52 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| OPERATOR: DRILL | $27.44 | $15.65 | $43.09 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| OPERATOR: CRANE | $30.66 | $10.61 | $41.27 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| OPERATOR: CONCRETE FINISHING MACHINE | $20.03 | $6.55 | $26.58 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| OPERATOR: BROOM/SWEEPER | $24.12 | $5.52 | $29.64 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.76 | $3.31 | $23.07 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.08 | $7.77 | $29.85 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER | $21.19 | $6.82 | $28.01 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row |
| Painter | HIGHWAY/PARKING LOT STRIPING: PAINTER | $14.05 | $1.62 | $15.67 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row |
| Truck driver | TRUCK DRIVER: WATER TRUCK | $24.90 | $11.70 | $36.60 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row |
| TRUCK DRIVER: VACTOR | $23.40 | $0.00 | $23.40 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $26.25 | $12.86 | $39.11 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK | $24.16 | $11.77 | $35.93 | DOL survey SUUT2019-020, 2023-04-03 · Price a crew using this row |
Next steps
From the rate to the payroll
- Price a crew from these rates — total package, cash in lieu of fringe and overtime on the base rate.
- Report them on Form WH-347 — the weekly federal certified payroll, column by column (Rev. January 2025).
- What Utah requires for certified payroll — the state report, its cadence and its source, next to the federal rule.
Other Utah counties
Beaver · Box Elder · Cache · Carbon · Daggett · Davis · Duchesne · Emery · Garfield · Grand · Iron · Juab · Kane · Millard · Piute · Rich · Salt Lake · San Juan · Sanpete · Sevier · Summit · Tooele · Uintah · Utah · Wasatch · Washington · Wayne · Weber