Utah · federal rates
Tooele County, Utah: Davis-Bacon wage rates (2026)
4 federal wage determinations cover Tooele County. Rates below were taken from SAM.gov on 2026-09-20.
Residential
UT20260036, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 53 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN | $16.06 | $1.97 | $18.03 | DOL survey SUUT2008-051, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Plumber / pipefitter | PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $30.60 | $10.85 | $41.45 | Union agreement PLUM0140-016, 2019-08-01 · Price a crew using this row |
| Carpenter | CARPENTER, INCLUDES METAL STUD INSTALLATION, AND SIDING INSTALLATION (EXCLUDES DRYWALL HANGING) | $15.26 | $0.00 | $15.26 | DOL survey SUUT2008-051, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Laborer | LABORER (CHAIN/CONCRETE SAW, JACKHAMMER AND VIBRATOR) | $18.63 | $6.35 | $24.98 | Union agreement LABO0295-020, 2012-07-01 · Price a crew using this row |
| LABORER: MASON TENDER (BRICK AND HOD) | $12.00 | $0.00 | $12.00 | DOL survey SUUT2008-051, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.95 | $0.00 | $12.95 | DOL survey SUUT2008-051, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| LABORER: LANDSCAPE | $10.00 | $0.19 | $10.19 | DOL survey SUUT2008-051, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| LABORER: COMMON OR GENERAL | $11.54 | $3.63 | $15.17 | DOL survey SUUT2008-051, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| LABORER: ASPHALT SHOVELER | $12.95 | $0.00 | $12.95 | DOL survey SUUT2008-051, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| LABORER: ASPHALT RAKER | $13.00 | $0.00 | $13.00 | DOL survey SUUT2008-051, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| Power equipment operator | OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | $15.65 | $37.15 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | $15.65 | $39.02 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | $15.65 | $40.02 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | $15.65 | $41.02 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | $15.65 | $41.54 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | $15.65 | $43.20 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | $15.65 | $38.06 | Union agreement ENGI0003-052, 2013-07-01 · Price a crew using this row | |
| OPERATOR: TRACKHOE | $14.89 | $0.00 | $14.89 | DOL survey SUUT2008-051, 2008-08-28 — survey rate from 2008; check whether your contract uses it | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER | $36.66 | $11.25 | $47.91 | Union agreement PLAS0568-001, 2025-07-01 · Price a crew using this row |
| Bricklayer / tile / terrazzo | BRICKLAYER | $17.92 | $0.00 | $17.92 | DOL survey SUUT2008-051, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Painter | PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $11.23 | $0.00 | $11.23 | DOL survey SUUT2008-051, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Roofer | ROOFER | $17.14 | $0.00 | $17.14 | DOL survey SUUT2008-051, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Sheet metal worker | SHEET METAL WORKER, INCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION | $15.31 | $0.00 | $15.31 | DOL survey SUUT2008-051, 2008-08-28 — survey rate from 2008; check whether your contract uses it |
| Truck driver | TRUCK DRIVER: WATER, FUEL & OIL TANK (LESS THAN 1,200 GAL.) | $29.37 | $14.65 | $44.02 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (6,000 GAL. TO LESS THAN 10,000 GAL) | $28.60 | $14.65 | $43.25 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (4,000 GAL. TO LESS THAN 6,000 GAL) | $28.33 | $14.65 | $42.98 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (25,000 GAL. AND OVER) | $31.20 | $14.65 | $45.85 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (20,000 GAL. TO LESS THAN 25,000 GAL) | $31.04 | $14.65 | $45.69 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (2,500 GAL. TO LESS THAN 4,000 GAL) | $29.53 | $14.65 | $44.18 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (15,000 GAL. TO LESS THAN 20,000 GAL) | $30.66 | $14.65 | $45.31 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (10,000 GAL. TO LESS THAN 15,000 GAL) | $30.59 | $14.65 | $45.24 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (1,200 GAL. TO LESS THAN 2,500 GAL) | $27.85 | $14.65 | $42.50 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: TRANSIT MIX (OVER 8 CU. YDS. TO 14 CU. YDS) | $29.72 | $14.65 | $44.37 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: TRANSIT MIX (0 CU. YDS. TO 8 CU. YDS).$ 29.62 14.65 TRUCK DRIVER: TIREMEN AND GREASER | $30.19 | $14.65 | $44.84 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: OIL SPREADER | $32.68 | $14.65 | $47.33 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: LOWBOY | $32.69 | $14.65 | $47.34 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (PICKUP TRUCK).$ 29.18 14.65 TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (LESS THAN 10 TONS) | $29.26 | $14.65 | $43.91 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (20 TONS AND OVER) | $29.69 | $14.65 | $44.34 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (15 TONS TO LESS THAN 20 TONS) | $29.53 | $14.65 | $44.18 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (10 TONS TO LESS THAN 15 TONS) | $29.42 | $14.65 | $44.07 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (LESS THAN 8 CU. YDS.) | $29.37 | $14.65 | $44.02 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (95 CU. YDS. TO LESS THAN 105 CU. YDS.) | $30.56 | $14.65 | $45.21 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (8 CU. YDS. TO LESS THAN 14 CU. YDS.) | $29.53 | $14.65 | $44.18 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (75 CU. YDS. TO LESS THAN 95 CU. YDS.) | $30.34 | $14.65 | $44.99 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (55 CU. YDS. TO LESS THAN 75 CU. YDS.) | $30.12 | $14.65 | $44.77 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (35 CU. YDS. TO LESS THAN 55 CU. YDS.) | $29.91 | $14.65 | $44.56 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (14 CU. YDS. TO LESS THAN 35 CU. YDS.) | $29.67 | $14.65 | $44.32 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (105 CU. YDS. TO LESS THAN 130 CU. YDS.) | $30.69 | $14.65 | $45.34 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: CONCRETE PUMPING | $29.62 | $14.65 | $44.27 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row | |
| TRUCK DRIVER: ARTICULATED | $32.14 | $14.65 | $46.79 | Union agreement TEAM0222-018, 2024-07-01 · Price a crew using this row |
Building
UT20260086, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 30 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN | $41.23 | $17.66 | $58.89 | Union agreement ELEC0354-001, 2024-06-01 · Price a crew using this row |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $31.86 | $15.83 | $47.69 | Union agreement ELEC0354-001, 2024-06-01 · Price a crew using this row | |
| ELECTRICIAN | $41.23 | $17.66 | $58.89 | Union agreement ELEC0354-001, 2025-06-11 · Price a crew using this row | |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $31.86 | $15.83 | $47.69 | Union agreement ELEC0354-001, 2025-06-11 · Price a crew using this row | |
| Plumber / pipefitter | PLUMBER/PIPEFITTER | $46.10 | $15.83 | $61.93 | Union agreement PLUM0140-001, 2025-08-01 · Price a crew using this row |
| Carpenter | CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $31.66 | $13.97 | $45.63 | Union agreement CARP0801-002, 2022-12-01 · Price a crew using this row |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $20.73 | $7.53 | $28.26 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| CARPENTER (FORM WORK ONLY) | $16.93 | $1.93 | $18.86 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.25 | $2.40 | $23.65 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| Laborer | LABORER: LANDSCAPE AND IRRIGATION | $9.50 | $0.00 | $9.50 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| LABORER: PIPELAYER | $13.57 | $0.00 | $13.57 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.94 | $0.00 | $14.94 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| LABORER: MASON TENDER - BRICK | $16.38 | $1.00 | $17.38 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| LABORER: COMMON OR GENERAL | $13.84 | $0.00 | $13.84 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| Ironworker | IRONWORKER, STRUCTURAL | $20.21 | $3.22 | $23.43 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| Power equipment operator | OPERATOR: LOADER | $19.34 | $0.00 | $19.34 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.48 | $0.00 | $14.48 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER | $15.00 | $0.00 | $15.00 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| Bricklayer / tile / terrazzo | TILE SETTER | $23.50 | $0.00 | $23.50 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| TILE FINISHER | $13.54 | $0.00 | $13.54 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| BRICKLAYER | $22.13 | $1.67 | $23.80 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it | |
| Painter | PAINTER (BRUSH, ROLLER, AND SPRAY, EXCLUDING DRYWALL/FINISHER AND TAPER) | $26.00 | $8.78 | $34.78 | Union agreement PAIN0077-004, 2025-08-01 · Price a crew using this row |
| Roofer | ROOFER | $13.22 | $0.00 | $13.22 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
| Sheet metal worker | SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $46.79 | $14.89 | $61.68 | Union agreement SHEE0312-002, 2025-07-01 · Price a crew using this row |
| Truck driver | TRUCK DRIVER: DUMP TRUCK | $15.50 | $0.00 | $15.50 | DOL survey SUUT2012-018, 2014-07-29 — survey rate from 2014; check whether your contract uses it |
Heavy
UT20260097, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 13 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | LINE CONSTRUCTION: LINEMAN | $58.83 | $21.21 | $80.04 | Union agreement ELEC0057-001, 2025-03-01 · Price a crew using this row |
| ELECTRICIAN | $41.23 | $17.66 | $58.89 | Union agreement ELEC0354-005, 2024-06-01 · Price a crew using this row | |
| Carpenter | CARPENTER (FORM WORK ONLY) | $24.61 | $8.45 | $33.06 | DOL survey SUUT2018-008, 2020-05-07 · Price a crew using this row |
| Laborer | LABORER LANDSCAPE | $23.97 | $9.70 | $33.67 | Union agreement LABO0295-001, 2019-07-01 · Price a crew using this row |
| LABORER: PIPELAYER | $18.47 | $9.00 | $27.47 | DOL survey SUUT2018-008, 2020-05-07 · Price a crew using this row | |
| LABORER: COMMON OR GENERAL | $18.33 | $6.70 | $25.03 | DOL survey SUUT2018-008, 2020-05-07 · Price a crew using this row | |
| Power equipment operator | POWER EQUIPMENT OPERATOR (MECHANIC) | $33.04 | $16.09 | $49.13 | Union agreement ENGI0003-034, 2020-07-01 · Price a crew using this row |
| POWER EQUIPMENT OPERATOR: LOADER | $31.99 | $17.64 | $49.63 | Union agreement ENGI0003-035, 2022-07-01 · Price a crew using this row | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.29 | $0.00 | $25.29 | DOL survey SUUT2018-008, 2020-05-07 · Price a crew using this row | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.40 | $16.96 | $40.36 | DOL survey SUUT2018-008, 2020-05-07 · Price a crew using this row | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER | $20.70 | $1.21 | $21.91 | DOL survey SUUT2018-008, 2020-05-07 · Price a crew using this row |
| Truck driver | TRUCK DRIVER: DUMP TRUCK | $29.67 | $14.65 | $44.32 | Union agreement TEAM0222-004, 2024-07-01 · Price a crew using this row |
Highway
UT20260112, modification 1 (published 2026-05-18)
Common trades from this wage determination. It lists 34 classifications in total; the full text is on SAM.gov.
| Trade | Classification | Base | Fringe | Listed total | Where the rate comes from |
|---|---|---|---|---|---|
| Electrician | ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $27.59 | $7.78 | $35.37 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row |
| Carpenter | CARPENTER, INCLUDES FORM WORK | $23.39 | $8.59 | $31.98 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row |
| Laborer | TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.59 | $8.65 | $29.24 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row |
| LABORER: GRADE CHECKER | $19.31 | $7.78 | $27.09 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| LABORER: PIPELAYER | $19.35 | $6.64 | $25.99 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.89 | $3.21 | $18.10 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| LABORER: LANDSCAPE | $14.60 | $2.66 | $17.26 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| LABORER: COMMON OR GENERAL | $17.32 | $2.66 | $19.98 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $21.11 | $8.65 | $29.76 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| Ironworker | IRONWORKER, REINFORCING | $26.61 | $11.60 | $38.21 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row |
| Power equipment operator | POWER EQUIPMENT OPERATOR (OILER) | $31.99 | $17.64 | $49.63 | Union agreement ENGI0003-021, 2022-07-01 · Price a crew using this row |
| OPERATOR: PAVEMENT MARKING GRINDER | $24.37 | $15.65 | $40.02 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| OPERATOR: SCREED | $22.41 | $15.65 | $38.06 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| OPERATOR: ROLLER | $25.85 | $15.65 | $41.50 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| OPERATOR: PUMP | $19.18 | $4.23 | $23.41 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.37 | $15.65 | $40.02 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| OPERATOR: MECHANIC | $27.55 | $15.65 | $43.20 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| OPERATOR: LOADER | $25.37 | $15.65 | $41.02 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| OPERATOR: GRADER/BLADE | $27.40 | $15.65 | $43.05 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| OPERATOR: DRILL | $27.44 | $15.65 | $43.09 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| OPERATOR: CRANE | $30.66 | $10.61 | $41.27 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| OPERATOR: CONCRETE FINISHING MACHINE | $18.76 | $6.55 | $25.31 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| OPERATOR: BROOM/SWEEPER | $22.56 | $6.55 | $29.11 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.31 | $3.31 | $23.62 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.95 | $6.81 | $28.76 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| Cement mason / concrete finisher | CEMENT MASON/CONCRETE FINISHER | $20.73 | $2.79 | $23.52 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row |
| Painter | HIGHWAY/PARKING LOT STRIPING: PAINTER | $17.97 | $1.62 | $19.59 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row |
| Truck driver | TRUCK DRIVER: WATER TRUCK | $24.27 | $11.09 | $35.36 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row |
| TRUCK DRIVER: VACTOR | $23.40 | $0.00 | $23.40 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $26.12 | $12.14 | $38.26 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| TRUCK DRIVER: LOWBOY TRUCK | $24.56 | $11.47 | $36.03 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row | |
| TRUCK DRIVER: DUMP TRUCK | $22.29 | $9.09 | $31.38 | DOL survey SUUT2019-024, 2023-04-03 · Price a crew using this row |
Next steps
From the rate to the payroll
- Price a crew from these rates — total package, cash in lieu of fringe and overtime on the base rate.
- Report them on Form WH-347 — the weekly federal certified payroll, column by column (Rev. January 2025).
- What Utah requires for certified payroll — the state report, its cadence and its source, next to the federal rule.
Other Utah counties
Beaver · Box Elder · Cache · Carbon · Daggett · Davis · Duchesne · Emery · Garfield · Grand · Iron · Juab · Kane · Millard · Morgan · Piute · Rich · Salt Lake · San Juan · Sanpete · Sevier · Summit · Uintah · Utah · Wasatch · Washington · Wayne · Weber